UK CBAM for Steel Importers 2027: Compliance Requirements, Emissions Verification and Import Tax Exposure

Writer: CBAM Research Team
CBAM Research Team
2 days ago
38 min read

CBAM Journal Research & Intelligence Team, Sekason Research Limited. Published November 2026.

Data verified: 17 November 2026 · Next review trigger: 20 November 2026 Brussels summit (reported UK-EU ETS linking declaration and mutual CBAM exemption; reported, not confirmed)

CBAM Journal Research Report | Sekason Research Limited | Position as at 17 November 2026 | UK jurisdiction (England, Scotland, Wales, Northern Ireland)


Disclaimer. 

This report is provided by CBAM Journal (Sekason Research Limited) for information only. It is not legal, tax, financial or regulatory advice, and it does not create an adviser-client relationship. It reflects publicly available sources as at 17 November 2026. UK CBAM instruments and HMRC default values are still in draft and may change, and figures marked Illustrative are estimates, not liabilities. Readers should take qualified professional advice before acting. To the fullest extent permitted by law, Sekason Research Limited accepts no liability for loss arising from reliance on this report.


CBAM Journal cover with UK flag and steel coils, announcing 1 January 2027 UK CBAM takes effect for steel importers.

1. Executive Summary

UK CBAM steel importers are charged on the emissions embodied in iron and steel imported from 1 January 2027 (Finance Act 2026 s.158(1)), but HMRC registration opens only on 1 January 2028 and the first return and payment, covering all of 2027, fall due on 31 May 2028 under SI 2026/830, 17 months after the first import. HMRC's illustrative rate of £9.69 per tCO2e (Q3 2026 UK ETS average £58.15; 2027 reduction factor 97.5%) puts the draft default value of 2.722 tCO2e per tonne for CN 7208 10 00 at an Illustrative £26.38 per tonne (HMRC, 16 October 2026; as at November 2026). A return filed on default values cannot later be amended to actual data (Finance Act 2026 Sch 17 para 8(2)), and actual data needs calendar-year monitoring (SI 2026/995 reg 9(1)) and an accredited verifier (reg 12(1)), so each supplier route must be settled before the 31 May 2028 return.


1.1 Three findings

  • FINDING: UK CBAM charges steel imports from 1 January 2027, but the first payment falls due on 31 May 2028, 17 months later (Finance Act 2026 s.158(1); SI 2026/830 reg 2, as at November 2026).

  • SO WHAT: Liability accrues from the first import while no cash leaves for 17 months, so the exposure is a provisioning problem before it is a payment problem.

  • NOW WHAT: Compliance Managers must audit CN codes and issue supplier evidence requests by 31 December 2026.


The decision that carries financial weight is the choice between HMRC default values and verified actual emissions. Defaults are single values per CN code in a draft notice that has not commenced.

Three inputs are still moving: the binding Q1 2027 rate, the final default-values notice and a UK-EU linking declaration, reported for 20 November 2026, that is not law.


1.2 What to do before 1 January 2027

  • FINDING: HMRC guidance states that record keeping starts on 1 January 2027 even for an importer that is not liable (HMRC, Check if you'll need to register for CBAM, updated 10 November 2026), and a record-keeping failure carries a £500 penalty (Finance Act 2026 Sch 17 para 39).

  • SO WHAT: Missing records cannot be rebuilt later, and the evidence for 2027 imports must exist before any HMRC registration service does.

  • NOW WHAT: Have the record set live and the code audit complete by 31 December 2026.


Table 1: Pre-launch actions (as at November 2026)

Action

Owner

Date

Audit 12 months of customs entries by 8-digit CN code

Compliance Manager

31 December 2026

Issue written data requests to every steel supplier

Import/Export Manager

31 December 2026

Set up the record set for every CBAM import

Compliance Manager

1 January 2027

Confirm the binding Q1 2027 rate and the applicable penalty rates

CFO

31 December 2026

Start the monthly £50,000 registration tests

Compliance Manager

1 January 2027

 Source: Finance Act 2026 Sch 17; HMRC guidance, November 2026.


2. Regulatory Context


2.1 Legal architecture: the Act and five SIs

  • FINDING: Finance Act 2026 Part 5 (ss.142 to 158, with Schedules 16 and 17) and five statutory instruments, SI 2026/802, 809, 830, 994 and 995, take effect for UK CBAM from 1 January 2027 (as at November 2026).

  • SO WHAT: The importer, not the customs agent or the supplier, carries the liability under s.146, so the legal risk sits with the importing business, and the remaining uncertainty lies in draft notices and guidance rather than in the Act.

  • NOW WHAT: Compliance teams must base procedures on the Act and the five instruments, treat every notice as draft until commencement, and review procedures by 31 December 2026.


The Act charges UK CBAM on the emissions embodied in a CBAM good when it is imported (ss.142 and 143), makes the importer liable (s.146), and lists the goods by commodity code in Schedule 16. Schedule 17 carries registration, accounting, returns, penalties and the power to set default values by notice.

The instruments fill in the mechanics. SI 2026/802 and SI 2026/809 were made on 13 July 2026, and SI 2026/830 on 14 July 2026. SI 2026/995 was made on 8 September 2026.


Table 2: UK CBAM instrument register (as at November 2026)

Instrument

What it does

In force

Status

Finance Act 2026 Part 5, Schs 16-17

Charge, liability, goods, registration, returns, penalties

1 January 2027 (s.158(1))

LAW

SI 2026/802

Administrative provisions: records, returns

1 January 2027

LAW

SI 2026/809

Rate calculation and carbon price relief

1 January 2027

LAW

SI 2026/830

Transitional dates: 2027 period, 31 January 2028, 31 May 2028

1 January 2027

LAW

SI 2026/994

Brings late-payment interest into force for CBAM

1 January 2027

LAW

SI 2026/995

Emissions determination, monitoring, verification

1 January 2027

LAW

Source: legislation.gov.uk; instruments listed in Section 10.


2.2 What changed in 2026

  • FINDING: SI 2026/830 reg 2(3) makes 2027 a single accounting period ending 31 December 2027, with return and payment due by 31 May 2028, and quarterly periods begin on 1 January 2028 (as at November 2026).

  • SO WHAT: The first UK CBAM charge is paid 17 months after the first import, followed by four quarterly payments through 28 February 2029.

  • NOW WHAT: Finance teams must follow Section 5.6 and start provisioning by 1 January 2027.


Sources dated before September 2026 may describe earlier drafts. The legislation took its current shape across 2026: consultation on draft legislation from 10 February to 24 March, the instruments in July and September, and the default values and illustrative rates on 16 October.


Table 3: UK CBAM change log (as at November 2026)

Date

Change

Source

26 November 2025

Budget 2025 confirms 1 January 2027 start; indirect emissions delayed until 2029 at the earliest

HM Treasury, Budget 2025

13-14 July 2026

SIs 2026/802, 809 and 830 made

16 July 2026

HMRC registration and records guidance; draft force of law notice

HMRC

8 September 2026

SI 2026/995 made

16 October 2026

Draft default values, illustrative rates, emissions guidance

HMRC

 

2.3 Enacted law, draft notices and proposals

  • FINDING: GOV.UK states that the draft force of law notices "have not yet commenced and do not currently have the force of law", while the draft default values are set to apply from 1 January 2027 to 31 December 2028 (GOV.UK, as at November 2026).

  • SO WHAT: Default values, any mark-up and verifier rules can still change before 1 January 2027, so any cost figure built on them carries that risk.

  • NOW WHAT: Re-read the final notices against this report on or after 1 January 2027.


The Act and the five instruments are adopted law. The notices that carry default values, verifier requirements and administrative detail are drafts. The binding quarterly rate is proposed, and the registration service is announced for 2028.

.

Table 4: Status of items relied on in this report (as at November 2026)

Item

Status

Label

Finance Act 2026 Part 5; SIs 2026/802, 809, 830, 994, 995

Adopted; commence 1 January 2027

LAW

Force of law notices (administrative, emissions and verification, default values)

Draft; not commenced

DRAFT

Binding quarterly rate from Q1 2027

Proposed; HMRC states publication before end-2026

GUIDANCE

HMRC registration service

Opens 1 January 2028 (HMRC)

GUIDANCE

Country-specific default values

Proposed; from 2029

DRAFT

Indirect emissions in scope

Announced as delayed to 2029 at the earliest; no legislation

GUIDANCE

Refined petroleum products extension

Under consultation; no decision

SECONDARY - UNVERIFIED

UK-EU ETS linking and mutual CBAM exemption

Reported draft; not law

SECONDARY - UNVERIFIED

Source: GOV.UK force of law notices page; HMRC policy summary, 2 November 2026; Budget 2025.


2.4 How this report is built: source hierarchy and labels

  • FINDING: HMRC's draft default-values notice states that a 10% mark-up has been applied to UK CBAM default values in all sectors except fertilisers (HMRC, 16 October 2026; as at November 2026).

  • SO WHAT: The notice indicates that the published default values already include the mark-up, but the sector default pages do not say so and HMRC will review the mark-up level when country-specific values start in 2029, so a cost model built on the defaults carries that uncertainty.

  • NOW WHAT: Check every SECONDARY - UNVERIFIED item against its primary source before the first return is filed on 31 May 2028.

Every claim carries one of four labels. Primary sources are legislation.gov.uk and HMRC or GOV.UK pages. Secondary sources are law-firm notes, trade press and aggregators, and they are never the sole support for a date, rate, threshold or penalty.


Table 5: Source-label legend

Label

Meaning

LAW

Act or statutory instrument

DRAFT

Draft force of law notice or draft guidance

GUIDANCE

HMRC or GOV.UK published guidance

SECONDARY - UNVERIFIED

Reported by a secondary source only

 

3. Compliance Obligations


3.1 Establish scope: the steel product register

  • FINDING: Finance Act 2026 Schedule 16 lists heading 7204 (ferrous waste and scrap) among the exceptions to chapter 72, and HMRC's policy summary states that scrap is excluded from 1 January 2027, so scrap is outside UK CBAM scope (as at November 2026).

  • SO WHAT: A wrong classification either adds supplier data cost for an excluded good or leaves a UK CBAM liability unreported, and the penalty for an inaccurate return follows the existing penalty regime that Schedule 17 paras 35 to 37 amend, not a figure stated in Schedule 17.

  • NOW WHAT: Audit 12 months of customs entries by 8-digit CN code by 31 December 2026.


UK CBAM scope is set by commodity code, not by product description. Schedule 16 lists chapter 72 (except heading 7204 scrap and the listed ferro-alloys), headings 7301 to 7311, 7318 and 7326, and 2601 12. The downstream articles under 7318 and 7326 matter most for stockholders, because fasteners and steel articles carry the same duties as coil.


Table 6: Steel scope register (as at November 2026)

CN code or group

Scope position

Default (tCO2e/t)

Source

Chapter 72 (except 7204 and listed ferro-alloys)

In scope

See Table 17

Sch 16

7301-7311

In scope

See Table 17

Sch 16

7318, 7326

In scope (downstream articles)

Not retrieved

Sch 16

2601 12

In scope

Not retrieved

Sch 16

7204 ferrous scrap

Excepted from scope

Not applicable

Sch 16; HMRC policy summary

Listed ferro-alloys

Excepted from scope

Not applicable

Sch 16

Source: Finance Act 2026 Schedule 16; HMRC policy summary, updated 2 November 2026.


3.2 Establish liability and the registration tests

  • FINDING: Finance Act 2026 Schedule 17 para 2(2) makes a person registrable when imports of CBAM goods reach £50,000 in the preceding 12 months, tested on the first day of each month, or are expected to reach £50,000 within 30 days (as at November 2026).

  • SO WHAT: An importer that crosses either limb without notifying HMRC faces a £500 fixed penalty plus £40 for each day of failure (para 38(2)).

  • NOW WHAT: Run both tests on the first day of every month from 1 January 2027.


UK CBAM is not charged where the importer is neither registrable nor registered at the time of import, or imports otherwise than in the course of a business (s.147(1)). Importers that trigger registration in 2027 must register by 31 January 2028 (SI 2026/830 reg 2(2)).

HMRC expects over 80% of otherwise affected importers to fall below the £50,000 threshold (HM Treasury policy paper, updated 9 September 2026). The sources cited do not state how the value of goods is determined for the test.


Table 7: Registration test grid (as at November 2026)

Test

Trigger

Date

Consequence

Backward limb

£50,000 or more imported in the preceding 12 months

First day of each month

Registrable; register by 31 January 2028 for 2027 triggers

Forward limb

£50,000 or more expected within 30 days

Any day

Registrable; same deadline

Failure to notify

Required notification not made

From trigger

£500 plus £40 a day

Source: Finance Act 2026 Sch 17 paras 2 and 38(2); SI 2026/830 reg 2(2).


3.3 Keep records from day one

  • FINDING: SI 2026/802 reg 6(2) requires records to be preserved for 6 years beginning the day after the end of the accounting period, and HMRC guidance states that record keeping starts on 1 January 2027 (as at November 2026).

  • SO WHAT: Evidence for 2027 imports must exist before any HMRC service does, and a failure to keep or preserve a record carries a £500 penalty (Sch 17 para 39).

  • NOW WHAT: Have the record set live for every CBAM import by 1 January 2027.


SI 2026/802 reg 5 applies to any person who imports a CBAM good in the course of a business, whether or not that person is liable. Reg 5 lists four record items: commodity code and description, date imported, value and weight. The checklist below adds the evidence that the identity, emissions and relief rules require.


Table 8: Record checklist (as at November 2026)

Record

Basis

Commodity code and description of each good

SI 2026/802 reg 5(a)

Date the good was imported into the United Kingdom

SI 2026/802 reg 5(b)

Value of the good

SI 2026/802 reg 5(c)

Weight of the good

SI 2026/802 reg 5(d)

Importer identity, and the person on whose behalf a declaration was made

Finance Act 2026 s.146(2)

Emissions route: default value or verified actual data

SI 2026/995 regs 4 and 12

Verification report or good-specific verification summary, kept 6 years

SI 2026/995 reg 16

Carbon price evidence, where relief is claimed

SI 2026/809 reg 5

 3.4 Determine emissions: default or actual

  • FINDING: A UK CBAM return that uses default values cannot later be amended to replace them with actual emissions data (Finance Act 2026 Sch 17 para 8(2)), and the single 2027 return is due 31 May 2028 (as at November 2026).

  • SO WHAT: A low-emission supplier is charged at an origin-blind default unless its data is verified before filing, so the choice fixes the cost of every tonne in the return.

  • NOW WHAT: Decide the route for each supplier and CN code, and secure the evidence, before filing on 31 May 2028.


On the default route, the emissions are the weight of the good multiplied by the default value (SI 2026/995 reg 4). HMRC's draft notice sets one value per CN code regardless of origin or production route, on a trade-weighted average basis built from EU data, with EU-origin data excluded. The notice states that a 10% mark-up has been applied in all sectors except fertilisers, which indicates that the published values already include it.


The actual route requires calendar-year monitoring and an accredited verifier (Section 3.5). How actual data for a precursor interacts with a default for the final good is not addressed in the instruments cited.


Table 9: Default-or-actual decision tree (as at November 2026)

No.

Question

If yes

If no

1

Is the good within a Schedule 16 commodity code?

Go to question 2

No UK CBAM on the good

2

Is the importer registrable or registered at import (s.147(1)(a))?

Go to question 3

No charge on that import

3

Can the supplier deliver calendar-year monitoring and a report from an accredited verifier before filing?

Actual route available; go to question 4

Default route

4

Does the saving exceed the verification cost? (Section 7.4)

Choose actual; secure evidence

Default route

5

Is the decision documented?

File

Document it first

Source: Finance Act 2026 s.147 and Sch 17 para 8(2); SI 2026/995 regs 4, 9, 12.



3.5 Verified actual data: what the supplier must deliver

  • FINDING: SI 2026/995 requires emissions to be monitored over a calendar year (reg 9(1)) and verified by an accredited verifier (reg 12(1)), reg 15(1)(a) refers to full membership of the Global Accreditation Cooperation Incorporated, and the verification report or good-specific verification summary must be kept for 6 years (reg 16(3)) (as at November 2026).

  • SO WHAT: A consultant puts data collection and verification at 8 to 12 weeks (Jason Gordon, CBAM Proof, via SteelRadar), so a supplier asked late may not deliver verified data before the return is due and the importer falls back to default values.

  • NOW WHAT: Issue written supplier requests by 31 December 2026.


UKAS is not named in the regulation text cited, and the monitoring period that applies to goods imported in 2027 is not specified in the instruments cited. No authoritative statement on verifier capacity, cost or lead time was found.


Table 10: Supplier evidence chain (as at November 2026)

Stage

Who

Requirement

Source

Monitor

Supplier

Calendar-year monitoring period

SI 2026/995 reg 9(1)

Verify

Accredited verifier

Accredited to verify relevant emissions

SI 2026/995 reg 12(1), 15(1)(a)

Report

Importer

Keep the verification report or good-specific verification summary

SI 2026/995 reg 16(1)

Relief form

Verifier

Carbon pricing verification form, where relief is claimed

HMRC guidance

Record

Importer

Keep the report for 6 years

SI 2026/995 reg 16(3)

3.6 Carbon Price Relief

  • FINDING: SI 2026/809 reg 13(6) caps carbon price relief at the UK CBAM liability for the good, and a draft list of 16 qualifying overseas carbon pricing schemes was reported in August 2026 (as at November 2026).

  • SO WHAT: Relief reduces a charge only where the supplier's origin carbon price is verified and qualifying, and a consultant reports that Turkey's ETS pilot leaves relief near zero.

  • NOW WHAT: Check each supplier origin against the qualifying schemes before relying on relief in the return due 31 May 2028.


HMRC states that the total relief claimed cannot exceed the CBAM liability due (HMRC, Work out your carbon price relief, updated 2 November 2026). The claim deadline, the content of the draft list of 16 schemes and the verifier sign-off requirements for the carbon pricing verification form were not found.


Table 11: Carbon price relief by origin (as at November 2026)

Origin

What the sources state

Status

Turkey

ETS pilot means relief near zero (consultant)

SECONDARY - UNVERIFIED

India

No qualifying scheme identified

Not found

China

No qualifying scheme identified

Not found

EU

Qualifying status not identified

Not found

3.7 Returns, payment, penalties and interest

  • FINDING: Finance Act 2026 Schedule 17 sets a failure-to-notify penalty of £500 plus £40 a day (para 38(2)) and a record-keeping penalty of £500 (para 39), and SI 2026/994 switches on late-payment interest from 1 January 2027 (as at November 2026).

  • SO WHAT: Schedule 17 states no amounts for late returns, late payment or inaccurate returns, because paras 35 to 37 apply existing penalty regimes, so a CFO cannot cap the exposure from Schedule 17 alone.

  • NOW WHAT: Diarise 31 May 2028 and confirm the penalty and interest rates that apply with HMRC before 31 January 2028.


Account and payment duties run per accounting period (Sch 17 para 6), as does the return (para 7). HMRC's policy summary lists penalty heads for a failure to submit a return, a failure to pay, errors in returns and a failure to comply with an information notice, without amounts.


Table 12: UK CBAM penalty and interest schedule (as at November 2026)

Head

Amount

Source

Failure to notify

£500 plus £40 a day

Sch 17 para 38(2)

Failure to keep or preserve records

£500

Sch 17 para 39

Late return, late payment, inaccurate return

Not stated in Schedule 17; existing penalty regimes applied (paras 35 to 37)

Sch 17 paras 35 to 37; HMRC policy summary

Interest on late payment

In force 1 January 2027; rate not stated in the sources cited

SI 2026/994

3.8 Customs procedures and Northern Ireland

  • FINDING: Finance Act 2026 s.144(5)(a) treats a Union good that enters Northern Ireland as imported into the United Kingdom, and HMRC states that UK CBAM applies throughout the UK, including Northern Ireland, from 1 January 2027 (as at November 2026).

  • SO WHAT: Northern Ireland importers and users of special customs procedures cannot rely on the general rule alone, because s.145 charges the emissions embodied when the good was declared to the procedure, and s.144 contains no Windsor Framework wording.

  • NOW WHAT: Importers in Northern Ireland or using special customs procedures must take specific advice by 31 December 2026.


Under s.145(2), UK CBAM is charged on the emissions embodied in a good when it was declared for a special customs procedure, and outward processing is excluded (s.145(4)). The treatment of customs warehousing, the Customs Declaration Service data elements and the authorisation of an agent in the CBAM service were not found.


4. Key Dates and Deadlines


4.1 The 2027-28 compliance calendar

  • FINDING: UK CBAM obligations run from 1 January 2027, registration opens 1 January 2028, the registration deadline for 2027 triggers is 31 January 2028, and the 2027 return and payment fall due 31 May 2028 (as at November 2026).

  • SO WHAT: Cash falls due in five instalments between 31 May 2028 and 28 February 2029.

  • NOW WHAT: Load every date in Table 13 into the compliance calendar by 31 December 2026.


The dates for 30 November 2028 and 28 February 2029 come from the HMRC policy summary and the Act's default, not from SI 2026/830. Treat them as one tier below the dates in the instrument.

The first quarterly period under SI 2026/830 ends on 31 March 2028, with payment due on 31 July 2028, and the second ends on 30 June 2028, with payment due on 29 September 2028. Those payment dates fall three to four months after period end, later than the Act's default of the last working day of the second month (Sch 17 para 6(3)).


Table 13: UK CBAM compliance calendar (as at November 2026)

Date

Event

Instrument

Status

1 January 2027

Charge applies; interest in force

FA 2026 s.158(1); SI 2026/994

LAW

1 January 2027

Record keeping starts

HMRC guidance

GUIDANCE

31 December 2027

2027 accounting period ends

SI 2026/830

LAW

1 January 2028

Registration opens; quarterly periods begin

HMRC policy summary

GUIDANCE

31 January 2028

Registration deadline for 2027 triggers

SI 2026/830 reg 2(2)

LAW

31 May 2028

2027 return and payment

SI 2026/830 reg 2(3)-(4)

LAW

31 July 2028

Q1 2028 return and payment

SI 2026/830

LAW

29 September 2028

Q2 2028 return and payment

SI 2026/830

LAW

30 November 2028

Q3 2028 payment

HMRC policy summary; Act default

GUIDANCE

31 December 2028

Draft default-value period ends

Draft notice

DRAFT

28 February 2029

Q4 2028 payment

HMRC policy summary; Act default

GUIDANCE


4.2 The timing trap

  • FINDING: Under Finance Act 2026 s.147(1)(a), UK CBAM is not charged on an import where the importer is neither registrable nor registered at the time of import, yet an importer becomes registrable on meeting the £50,000 test of para 2(2) while the registration service opens only on 1 January 2028 (as at November 2026).

  • SO WHAT: On the wording of s.147(1)(a), registration delay does not by itself remove the charge for an importer that is registrable at the time of import, so the importer may carry 2027 liability before it can register.

  • NOW WHAT: Treat the first import that meets the £50,000 test as the compliance start date, and record it from 1 January 2027.


HMRC places liability and record keeping at 1 January 2027 and registration at 1 January 2028. The instruments cited do not set out how liability attaches to imports made while an importer is registrable but cannot yet register. This report states the position from s.147(1)(a) and does not extend it.

An importer that crosses the threshold in 2027 has no HMRC service to register in until 2028. The record set is therefore the only evidence of when the importer became registrable. Keep the monthly test results, the import values behind them and the date each limb was met.


Table 14: Timing-trap swim-lane (as at November 2026)

Dimension

Position

Date

Source

Liability

Imports on or after the start date

1 January 2027

FA 2026 s.158(1)

Registrability

First import meeting the para 2(2) test

From first qualifying import

FA 2026 Sch 17 para 2

Records

Required whether or not liable

1 January 2027

HMRC guidance

Registration

Service opens; deadline for 2027 triggers

1 January 2028; 31 January 2028

HMRC; SI 2026/830

Return and payment

Single 2027 period

31 May 2028

SI 2026/830

4.3 Where UK and EU dates diverge for a cross-border importer

  • FINDING: UK CBAM requires the 2027 return by 31 May 2028, while EU CBAM requires the first annual declaration by 30 September 2027 for 2026 under Article 6(1) of Regulation (EU) 2023/956 as amended, with a 50-tonne threshold (as at November 2026; operative wording unverified against EUR-Lex).

  • SO WHAT: A UK importer that also imports into the EU customs territory faces a separate and earlier EU CBAM deadline, which follows from Article 5 and is not addressed by any source cited.

  • NOW WHAT: Importers with EU exposure must check their EU CBAM position separately by 30 September 2027.


Section 4.3 applies only to importers exposed to both regimes. It does not replace the UK analysis in the rest of the report. The UK threshold is a value test in pounds and the EU threshold is a mass test in tonnes, so an importer can meet one and not the other.


Table 15: UK CBAM and EU CBAM dates for dual-exposure importers (as at November 2026)

Obligation

UK CBAM

EU CBAM

Charge or definitive period

1 January 2027

1 January 2026 (secondary)

Registration or authorisation

Opens 1 January 2028

Authorised declarant status before importing (Art 5; unverified)

First return or declaration

31 May 2028

30 September 2027 (Art 6(1); unverified)

Certificates

None

Sales from 1 February 2027 (Art 20(1); unverified)

Threshold

£50,000 in value

50 tonnes net mass

Free-allocation factor

97.5% for 2027

97.5% (2026), 95% (2027) (secondary; not equivalent)

 

5. Financial Exposure and Risk


5.1 How the UK CBAM rate is built

  • FINDING: Finance Act 2026 s.149 sets the UK CBAM rate as the prior-quarter UK ETS average auction clearing price reduced by the sector's baseline free allocation percentage, and HMRC's illustrative steel rate is £9.69 per tCO2e, built from a Q3 2026 average of £58.15 and a 2027 reduction factor of 97.5% (HMRC, 16 October 2026; as at November 2026).

  • SO WHAT: The rate for a quarter's imports depends on the auction prices of the quarter before it, and December UKA futures averages (secondary-market data, not auction prices) ran from £52.41 in May 2026 to £63.94 in October 2026.

  • NOW WHAT: Budget on the binding Q1 2027 rate once it is published on GOV.UK, which HMRC states will happen before 31 December 2026.


HMRC states that the illustrative rates do not create or imply any tax liability. The steel baseline free allocation percentage is not published on the HMRC page. The UK ETS Authority's sub-installation checks may revise baseline percentages and the Q1 2027 rate.


Table 16: Illustrative UK CBAM rates by sector (as at November 2026)

Sector

Illustrative rate (£ per tCO2e)

Provenance

Iron and steel

9.69

GOV.UK, 16 October 2026

Cement

8.78 (baseline free allocation 87.1%)

GOV.UK, 16 October 2026

Aluminium

9.79

cbamguide.com, 23 October 2026; SECONDARY - UNVERIFIED

Fertilisers

1.45

cbamguide.com; SECONDARY - UNVERIFIED

Hydrogen

9.24

cbamguide.com; SECONDARY - UNVERIFIED

Inputs: UK ETS Q3 2026 average £58.15; 2027 reduction factor 97.5%. Source: HMRC illustrative rates page.


5.2 Default-value exposure for steel

  • FINDING: The draft UK CBAM default value is 2.722 tCO2e per tonne for CN 7208 10 00, 2.856 for 7207 11 14, 3.049 for 7210 49 00 and 3.736 for 7306 11 00, which at the Illustrative £9.69 rate gives £26.38, £27.67, £29.54 and £36.20 per tonne (HMRC and GOV.UK, 16 October 2026; as at November 2026).

  • SO WHAT: Higher-value lines carry far larger charges than flat carbon steel, for example 6.367 tCO2e per tonne for CN 7304 41 00, an Illustrative £61.70 per tonne, so product mix drives cost.

  • NOW WHAT: Apply Table 17 to the importer's own 12-month import mix by 31 December 2026.


The per-tonne figures multiply the draft default by the illustrative rate. They are not liabilities, and the notice indicates that the published values already carry the 10% mark-up (Section 2.4). The GOV.UK steel default table was read only as far as CN 7306 40 80, so the register below is partial.


Table 17: Steel default values and Illustrative cost per tonne (as at November 2026)

CN code

Default (tCO2e/t)

Illustrative £ per tonne at £9.69

7210 11 00

2.636

25.54

7208 10 00

2.722

26.38

7207 11 14

2.856

27.67

7210 49 00

3.049

29.54

7306 11 00

3.736

36.20

7219 11 00

5.687

55.11

7302 10 22

6.223

60.30

7304 41 00

6.367

61.70

Status: DRAFT notice, not commenced; 10% mark-up stated in the notice. Source: GOV.UK iron and steel default values, 16 October 2026.



5.3 Actual versus default: the break-even

  • FINDING: EU CBAM benchmark values for CN 7208 10 00 are 1.370 tCO2e per tonne for the BF/BOF route, 0.481 for DRI/EAF and 0.072 for scrap/EAF (Implementing Regulation (EU) 2025/2620; EU regime, not UK boundaries), against a UK CBAM draft default of 2.722 (as at November 2026).

  • SO WHAT: Production route drives intensity, and because the UK default is one value per CN code regardless of route, a supplier on a lower-emission route lowers the UK CBAM charge only if its data is verified.

  • NOW WHAT: Rank suppliers by production route and volume before requesting verification, and complete the ranking by 31 December 2026.


No UK-basis actual intensity for steel is published. Sandbag, a think tank, models 1.10 tCO2 per tonne for AM/NS India's Hazira plant (4 August 2026). That is analyst modelling, not company disclosure. The break-even calculation sits in Section 7.4, with every input labelled.


Table 18: EU CBAM benchmark values against the UK CBAM draft default for CN 7208 10 00 (as at November 2026)

Route

EU CBAM benchmark (tCO2e/t)

UK CBAM draft default (tCO2e/t)

BF/BOF

1.370

2.722

DRI/EAF

0.481

2.722

Scrap/EAF

0.072

2.722

The EU values are benchmarks under Implementing Regulation (EU) 2025/2620 and are not UK CBAM values.


5.4 Penalties and limits

  • FINDING: Finance Act 2026 Schedule 17 para 46 sets assessment time limits of 4 years from the day the failure began and 20 years where the loss was deliberate or relates to a registration failure (as at November 2026).

  • SO WHAT: Deliberate-error and registration-failure exposure runs for 20 years, and an insufficiency of funds is not a reasonable excuse (para 40(2)(a)).

  • NOW WHAT: Record the evidence behind each default-or-actual decision in the supplier file before the first return is filed on 31 May 2028.


A penalty may be reduced to any amount, including nil (para 45). The amounts stated in Schedule 17 are in Table 12. Amounts for late returns, late payment and inaccuracy are not restated there (Section 3.7).


5.5 Macro exposure and what is not known

  • FINDING: The Exchequer impact of UK CBAM is certified at £30m in 2026-27, £140m in 2027-28, £180m in 2028-29, £175m in 2029-30 and £155m in 2030-31, with about 10,000 businesses affected (HM Treasury policy paper, updated 9 September 2026; as at November 2026).

  • SO WHAT: These figures cover all five sectors combined, and no official steel-specific cost exists, so each importer must build its own figure.

  • NOW WHAT: Use the worked example in Section 7.4 as the template and complete the importer's own figure by 31 December 2026.


The same paper estimates a one-off business cost of £9m and an ongoing cost of £16m a year, and says about 80% of CBAM goods come from countries with carbon pricing. A shadow minister's claim of a "£25 per tonne" effect on the UK ETS price by 2030 is a political characterisation and not an official sector figure (Hansard, 27 January 2026).


Table 19: UK CBAM Exchequer impact, all sectors (as at November 2026)

Year

2026-27

2027-28

2028-29

2029-30

2030-31

£m

30

140

180

175

155

Source: GOV.UK policy paper, first published 26 November 2025, updated 9 September 2026.


5.6 Provisioning and cash timeline

  • FINDING: SI 2026/830 reg 2(3) requires payment for the 2027 accounting period before the end of 31 May 2028 (as at November 2026).

  • SO WHAT: Liability accrues for about 17 months before any payment, so the exposure sits in the accounts from the first import.

  • NOW WHAT: This report is not accounting advice; raise provisioning with finance and the auditors by 1 January 2027.


Table 20: UK CBAM cash timeline (as at November 2026)

Accounting period

Payment due

Source

1 January to 31 December 2027

31 May 2028

SI 2026/830

Quarter ending 31 March 2028

31 July 2028

SI 2026/830

Quarter ending 30 June 2028

29 September 2028

SI 2026/830

Quarter ending 30 September 2028

30 November 2028

HMRC policy summary

Quarter ending 31 December 2028

28 February 2029

HMRC policy summary

 

6. Sector-Specific Impact Analysis


6.1 Steel in depth

  • FINDING: UK CBAM sets one default value per CN code regardless of origin or production route, CN 7318 and 7326 downstream articles are listed in Schedule 16 alongside chapter 72, and 7208 10 00 carries 2.722 tCO2e per tonne (as at November 2026).

  • SO WHAT: A stockholder of fasteners or steel articles carries the same registration and record-keeping duties as a coil importer, and UK defaults do not separate BF/BOF from EAF, so only verified data captures a cleaner route.

  • NOW WHAT: Segment imports by CN code and production route by 31 December 2026.


No UK downstream extension is indicated (Clifford Chance, September 2026, secondary). UK CBAM covers direct CO2 emissions only, and indirect emissions from electricity are excluded (HMRC technical guidance, 16 October 2026).


Import dependence is unreconciled between unofficial figures: about 70% of UK steel used was imported in 2025 (The Manufacturer, 22 October 2025), against about 60% (New Steel Construction, May 2026). Barrett Steel's CEO reported about 80% of long products coming from the UK and EU (May 2026). UK CBAM contains no exemption for EU-origin goods on the sources cited, so an EU-concentrated buyer still needs supplier data.


6.2 The origin lens: India, Turkey, China, EU

  • FINDING: UK steel quotas from 1 July 2026 give India 168,029 tonnes (Cat 1 33,456 t; Cat 4 125,796 t; Cat 20 8,777 t) and Turkey 223,550 tonnes in total, with a 50% out-of-quota duty (GOV.UK, UK's steel trade measure; as at November 2026).

  • SO WHAT: Duty-free quota does not reduce the UK CBAM charge, because CBAM sits on top of the quotas and both stack on landed cost.

  • NOW WHAT: Rank suppliers by volume and evidence readiness by 31 December 2026.


India-to-UK volume is unreconciled: about 620 kt in 2025, roughly 9% of UK imports (GMK Center, 16 July 2026), against about 140 kt in FY2025-26 (S&P Global, 17 June 2026). The periods and possibly the scope differ. Turkey exported 15.1 Mt of steel in 2025 with no UK split (GMK Center, 2 February 2026).

Neither the India-UK trade agreement, in force from 15 July 2026, nor the India-EU talks exempt India from CBAM, and CBAM was reportedly left out of the UK agreement. JSW Steel's co-managing director said about 90% of its sales are in India (19 May 2026). That is a company statement. No named UK importer compliance action and no filing-sourced Indian exporter volume was found.


Table 21: Origin readiness matrix (as at November 2026)

Origin

Volume to UK as sourced

UK quota

Evidence readiness

India

620 kt (2025) versus 140 kt (FY2025-26); unreconciled

168,029 t

No filing-sourced exporter volumes; JSW Steel reports about 90% of sales in India

Turkey

No UK split; 15.1 Mt total exports in 2025

223,550 t

ETS pilot; relief near zero (consultant)

China

No UK volume found

Not found

Trade body symposium of 140+ participants on default values and pre-verification (EU context)

EU

Not found

Not applicable

UK-EU buyers still need supplier data; no exemption in UK CBAM law cited

6.3 Other UK sectors for mixed-basket importers

  • FINDING: UK CBAM draft default values run from 2.030 to 6.023 tCO2e per tonne for aluminium, 0.240 to 2.075 for cement, 0.457 to 3.247 for fertilisers and 28.378 for hydrogen (HMRC, 16 October 2026; as at November 2026).

  • SO WHAT: An importer that buys cement or aluminium alongside steel faces a different rate and baseline for each sector, and electricity has no UK default value.

  • NOW WHAT: Apply the sector values to each basket by 31 December 2026.


Electricity is not listed in any HMRC sector list or default-value page, and an explicit exclusion has no primary source. Indirect emissions are out of scope until 2029 at the earliest (Budget 2025). Glass and ceramics are not in scope from January 2027.


Table 22: UK CBAM sector defaults (as at November 2026)

Sector

Default range (tCO2e/t)

Illustrative rate (£)

Status

Iron and steel

See Table 17

9.69

DRAFT

Aluminium

2.030-6.023

9.79 (secondary)

DRAFT

Cement

0.240-2.075

8.78

DRAFT

Fertilisers

0.457-3.247

1.45 (secondary)

DRAFT

Hydrogen

28.378

9.24 (secondary)

DRAFT

Electricity

None published

None

Not listed

 

7. Practical Action Framework


7.1 The plan from now to 31 May 2028

  • FINDING: As at 17 November 2026, 45 days remain to the start of the UK CBAM charge on 1 January 2027, with the registration deadline on 31 January 2028 and the return on 31 May 2028.

  • SO WHAT: Any task not complete by 1 January 2027 becomes a 2027 exposure that cannot be rebuilt later.

  • NOW WHAT: Assign an owner to every task in Table 23 before 1 January 2027.

  • The plan runs in four phases: to 31 December 2026, the first quarter of 2027, to 31 January 2028 and to 31 May 2028.


Code classification comes first because every later step depends on it. Supplier requests come second because verification takes 8 to 12 weeks on a consultant's estimate. Record keeping starts on 1 January 2027 and cannot wait for either.


Table 23: Action plan (as at November 2026)

Phase

Action

Owner

Date

Evidence

To 31 December 2026

Audit CN codes

Compliance Manager

31 December 2026

Code register

To 31 December 2026

Send supplier data requests

Import/Export Manager

31 December 2026

Dated requests

To 31 December 2026

Confirm binding rate and penalty rates

CFO

31 December 2026

HMRC publication

2027

Run monthly £50,000 tests; keep records

Compliance Manager

From 1 January 2027

Monthly log

To 31 January 2028

Register if triggered

Compliance Manager

31 January 2028

HMRC registration

To 31 May 2028

Choose route per supplier; file; pay

Compliance Manager; CFO

31 May 2028

Return; evidence file

7.2 Decision tree: default or actual

  • FINDING: Finance Act 2026 Schedule 17 para 8(2) bars replacing default-based emissions information with actual data after filing, and the 2027 return is due 31 May 2028 (as at November 2026).

  • SO WHAT: A wrong branch fixes the cost of every tonne in that return.

  • NOW WHAT: Document the decision and its evidence for each supplier and CN code before filing on 31 May 2028.


Apply Table 9 to each supplier and CN code in turn. For each, keep a one-page record of the route chosen, the evidence held, the saving calculated under Section 7.4 and the date of decision.

The third question in the tree carries most of the uncertainty. A supplier that cannot name an accredited verifier or confirm calendar-year monitoring should be treated as default-route until it can. The fourth question is arithmetic: the saving per tonne multiplied by annual tonnage, set against the verification cost.

The sources cited do not state whether default and actual data may be mixed within one return. Importers should obtain HMRC's position before relying on a mixed approach.


7.3 Supplier evidence kit

  • FINDING: SI 2026/995 requires calendar-year monitoring (reg 9(1)), an accredited verifier (reg 12(1)) and a verification report kept for 6 years (reg 16(3)) (as at November 2026).

  • SO WHAT: Without contractual data rights, the importer bears the default-value cost for a supplier's failure to deliver verified data.

  • NOW WHAT: Add the clauses below at the next contract renewal, and send written data requests to every steel supplier by 31 December 2026.


Table 24 lists the fields to request. HMRC's final verification forms were not read, so the fields must be matched to them before use. Request data for each CN code separately, because defaults are set per CN code and a supplier may ship several. Ask for the verifier's identity first, because the reg 15(1)(a) accreditation test decides whether the data counts as verified.


Table 24: Supplier data-request template (as at November 2026)

Field

What to request

Basis

Installation identity

Name, location, operator

Evidence chain

CN codes and product

Codes for each good supplied

Sch 16

Production route

BF/BOF, DRI/EAF or scrap/EAF

Section 5.3

Monitoring period

Calendar year covered

SI 2026/995 reg 9(1)

Emissions intensity

tCO2e per tonne for each CN code

SI 2026/995 reg 4

Verifier

Name and accreditation body

SI 2026/995 regs 12(1), 15(1)(a)

Verification report

Report or summary reference

SI 2026/995 reg 16

Carbon price paid

Scheme, amount, verification form

SI 2026/809 reg 5

Net weight basis

Weights per consignment

SI 2026/995 reg 4

Contract clauses to add:

1. Data rights: the supplier provides monitoring data and the verification report on request.

2. Timing: delivery within an agreed number of days of each calendar year-end.

3. Verifier access: the importer may contact the verifier.

4. Retention: the supplier keeps source data for at least 6 years.

5. Non-delivery: the contract states who bears the default-value cost if verified data is not delivered.


7.4 Worked example: default or actual emissions

  • FINDING: At the draft UK CBAM default of 2.722 tCO2e per tonne for CN 7208 10 00 and HMRC's illustrative rate of £9.69 per tCO2e, one tonne of hot-rolled coil carries an Illustrative charge of £26.38 (HMRC, 16 October 2026; as at November 2026).

  • SO WHAT: On an Illustrative 6,000 tonnes a year, the default route costs £158,257 against £104,652 on verified data at an Illustrative 1.800 tCO2e per tonne, a gross saving of £53,605 before verification cost.

  • NOW WHAT: Replace every Illustrative input with the importer's own figures by 31 December 2026, and decide the route before filing on 31 May 2028.


Illustrative scenario (fictional). A UK stockholder imports hot-rolled coil under CN 7208 10 00 from one overseas mill. All 2027 imports fall in one accounting period. The mill can supply verified data if asked by 31 December 2026. The core rule is liability = net weight (tonnes) x emissions intensity (tCO2e per tonne) x CBAM rate (£ per tCO2e).


Table 25: Sourced figures (as at November 2026)

Input

Value

Source

Default value, CN 7208 10 00

2.722 tCO2e per tonne

GOV.UK, 16 October 2026; DRAFT

Illustrative steel rate

£9.69 per tCO2e

HMRC, 16 October 2026; not binding

UK ETS Q3 2026 average

£58.15

HMRC, 16 October 2026

2027 reduction factor

97.5%

HMRC, 16 October 2026

Registration threshold

£50,000; 12-month look-back or 30 days forward

Sch 17 para 2(2)

Failure to notify

£500 plus £40 a day

Sch 17 para 38(2)

Key dates

31 January 2028; 31 May 2028

SI 2026/830

December UKA futures averages

£52.41 (May 2026); £63.94 (October 2026)

GOV.UK; futures, not auction prices

 

Table 26: Illustrative assumptions

Assumption

Value

Label

Annual tonnage

6,000 tonnes

Illustrative

Import value

£700 per tonne

Illustrative

First order

500 tonnes

Illustrative

Supplier actual intensity

1.800 tCO2e per tonne (no UK-basis figure is published)

Illustrative

Annual verification cost

£12,000

Illustrative

Days late notifying

30

Illustrative

Rate sensitivity

Rate scales in proportion to the UK ETS price, baseline held constant

Illustrative

 

Calculation steps:

1. Threshold test. £50,000 divided by £700 is 71.4 tonnes, so a first 500-tonne order (£350,000) meets the forward limb on the order date.

2. Default route. 6,000 x 2.722 = 16,332 tCO2e; 16,332 x £9.69 = £158,257, or £26.38 per tonne.

3. Actual route. 6,000 x 1.800 = 10,800 tCO2e; 10,800 x £9.69 = £104,652, or £17.44 per tonne.

4. Saving. £158,257 less £104,652 = £53,605; less £12,000 verification = £41,605.

5. Break-even. The saving per tonne is (2.722 less 1.800) x £9.69 = £8.93. £12,000 divided by £8.93 is 1,344 tonnes a year (1,343.2 unrounded). At 6,000 tonnes the break-even verification cost is £53,605.

6. Failure to notify. £500 + (30 x £40) = £1,700.


Table 27: Rate sensitivity at three UK ETS price points (Illustrative)

UK ETS price

Scaled rate (£/tCO2e)

Default route (£)

Actual route (£)

Saving (£)

£52.41

8.73

142,635

94,322

48,314

£58.15

9.69

158,257

104,652

53,605

£63.94

10.65

174,015

115,072

58,943

Table 27 values use unrounded rates; the displayed rates are rounded to the penny. The three prices are December futures averages, not auction prices, and the scaling assumes the baseline free allocation is unchanged. The steel baseline is unpublished, so the table shows direction and scale, not a forecast.

Decision line: on these Illustrative inputs, verification pays back above about 1,344 tonnes a year. The supplier request must go out by 31 December 2026, and verified evidence must be in hand before 31 May 2028.



7.5 Governance and ownership

  • FINDING: Finance Act 2026 s.146(1) makes the importer liable for UK CBAM, HMRC states that no liability attaches to the tax agent, and the first return is due 31 May 2028 (as at November 2026).

  • SO WHAT: Outsourcing declarations to an agent does not transfer liability, so an unreported charge falls on the importer.

  • NOW WHAT: Name an accountable owner and a deputy for each task in Table 28 by 31 December 2026.


Where a declaration is made on another person's behalf, liability falls on that person (s.146(2)(a)(ii)). Agents should be told about code classification and records, but the filing decision stays with the importer. The Compliance Manager owns classification and registration because both depend on legal tests. The CFO owns the route decision because it fixes cost, and the Import/Export Manager owns supplier contact because the evidence comes from suppliers.


Table 28: Responsibility matrix (R responsible, A accountable, C consulted, I informed)

Task

Compliance Manager

Import/Export Manager

CFO

Customs agent

CN code classification

A

R

I

C

Registration tests and registration

A/R

C

I

I

Supplier evidence requests

A

R

I

I

Default-or-actual decision

R

C

A

I

Provisioning

C

I

A/R

I

Return and payment

R

I

A

C

 

8. Strategic Outlook


8.1 Near term to 31 December 2026

  • FINDING: HMRC's policy summary, updated 2 November 2026, states "There are currently no jurisdictions exempt from CBAM", while Euronews reported on 6 November 2026 a draft EU-UK declaration on ETS linking and a mutual CBAM exemption "subject to respective laws and procedures", expected at the 20 November 2026 summit (as at November 2026).

  • SO WHAT: An exemption, if agreed, would still need a linking agreement and legislation, so UK CBAM records and the first return are required whatever the summit reports.

  • NOW WHAT: Continue preparation without pause and re-check the declaration's text before 31 December 2026.


Euronews reported no steel-specific provision. The European Commissioner for Climate Action said in December 2025, as reported by S&P Global, "We're not exempting anyone", and that the UK might be exempt once the two systems are fully linked. That statement is secondary reporting of a press event. Two other inputs land before year end: the final default-values notice and the binding Q1 2027 rate. Records must be kept from 1 January 2027 under SI 2026/802 whether or not an exemption follows, and the first return stays due on 31 May 2028 unless legislation changes it.


Table 29: Linking scenarios (no probabilities attached)

Scenario

What changes

What stays mandatory

Declaration published with a mutual exemption

Exemption subject to laws and procedures; needs agreement and legislation

Records from 1 January 2027

Declaration published with linking only

No exemption reported

UK CBAM applies; records; first return 31 May 2028

Declaration delayed or not published

No change

UK CBAM applies in full

 

8.2 2027 to 2029

  • FINDING: UK CBAM draft default values apply from 1 January 2027 to 31 December 2028, with country-specific values from 2029, and indirect emissions are excluded until 2029 at the earliest (draft notice; Budget 2025; as at November 2026).

  • SO WHAT: Country-specific defaults from 2029 raise the value of verified supplier data built in 2027 and 2028.

  • NOW WHAT: Complete the supplier data programme by 31 December 2028.


The draft notice sets one default value per CN code for 2027 and 2028, so supplier data collected in those two calendar years is the evidence base for any move to country-specific values. An importer that verifies one supplier in 2027 can reuse the monitoring approach in 2028 and compare the results against the default before the 2029 change.

Two further extensions remain open. A refined petroleum products extension is under consultation with no decision (Deloitte, secondary), and glass and ceramics are possible after 2027 per Clifford Chance (secondary) with no formal proposal found.


Table 30: UK CBAM horizon (as at November 2026)

Period

Rule

Status

2027 to 2028

Single default value per CN code

DRAFT

From 2029

Country-specific default values

DRAFT

2029 at the earliest

Indirect emissions may enter scope

GUIDANCE

No date

Refined products; glass and ceramics

SECONDARY - UNVERIFIED

The Compliance Manager's next action: complete the CN code audit and issue written data requests to every steel supplier by 31 December 2026, have the record set live on 1 January 2027, and settle the default-or-actual route for each supplier before the 31 May 2028 return.


9. FAQ Section


Do I need to register with HMRC for UK CBAM now, and when is my first return due?

No. HMRC's registration service opens on 1 January 2028, and importers that trigger registration in 2027 must register by 31 January 2028. The first return and payment, covering all of 2027 as one accounting period, are due by 31 May 2028 under SI 2026/830, and record keeping starts on 1 January 2027.


Can I switch from default values to actual emissions after I file my UK CBAM return?

No. Finance Act 2026 Schedule 17 para 8(2) bars amending a UK CBAM return to replace emissions information determined using default values with actual data. Whether default and actual data may be mixed within one return is not stated in the instruments cited. The route must therefore be settled with evidence in hand before filing on 31 May 2028.


Is steel scrap, or a downstream product such as fasteners, covered by UK CBAM?

Fasteners and steel articles under CN 7318 and 7326 are covered, and ferrous scrap under heading 7204 is not. Finance Act 2026 Schedule 16 lists 7318 and 7326 and excepts 7204 from chapter 72, and HMRC's policy summary excludes scrap from 1 January 2027. Importers should audit every steel CN code by 31 December 2026 and keep scrap lines on a separate register.


What does my overseas steel supplier have to do to give me verified emissions data, and who can verify it?

The supplier must monitor emissions over a calendar year (SI 2026/995 reg 9(1)) and obtain verification from an accredited verifier (reg 12(1)), with reg 15(1)(a) referring to full membership of the Global Accreditation Cooperation Incorporated. The importer must keep the verification report or good-specific verification summary for 6 years (reg 16(3)). UKAS is not named in the regulation text cited. Supplier requests should go out by 31 December 2026.


How much will UK CBAM cost me per tonne of steel I import?

An Illustrative £26.38 per tonne for CN 7208 10 00, being the draft default of 2.722 tCO2e per tonne multiplied by HMRC's illustrative rate of £9.69 per tCO2e. The binding Q1 2027 rate is due before the end of 2026 and the default values are draft, so the figure is an estimate and not a liability. Higher-value lines such as CN 7304 41 00, at 6.367 tCO2e per tonne, carry an Illustrative £61.70 per tonne.


Who is liable for UK CBAM if my customs agent makes the declaration?

The importer is liable under Finance Act 2026 s.146(1), and where a declaration is made on another person's behalf, liability falls on that person (s.146(2)(a)(ii)). HMRC states that no liability attaches to the tax agent. The first return is due 31 May 2028. Outsourcing the declaration therefore does not outsource the liability.


10. References and Sources

Research limitations. Quotations from the Finance Act 2026 and the instruments are fragments; check the full text on legislation.gov.uk before reliance.

Scope and defaults. The GOV.UK steel default table was read only to CN 7306 40 80, the sector default pages do not state that the 10% mark-up is included, and the steel baseline free allocation percentage and binding Q1 2027 rate are unpublished. Check Schedule 16 and HMRC's default values and rates pages before 31 December 2026.


Verification and relief. The monitoring period for goods imported in 2027, UKAS recognition, HMRC's verification forms, verifier capacity and cost, the relief claim deadline and the draft list of 16 schemes were not found. Whether default and actual data may be mixed, and how precursor data interacts with a default, are not stated. Check HMRC's verification and relief guidance before issuing supplier requests.


Penalties, valuation and customs. Late-return, late-payment and inaccuracy penalty amounts are applied through existing penalty regimes (Schedule 17 paras 35 to 37) and are not restated in the sources cited. Interest rates, the valuation method for the £50,000 test, customs warehousing treatment and Windsor Framework wording are not stated in the sources cited. Confirm with HMRC before 31 January 2028.

Dates and figures. The Royal Assent date is unverified, the policy paper figures should be re-checked on the GOV.UK page, and EU CBAM dates are unverified against EUR-Lex. The outcome of the 20 November 2026 summit falls after the position date. India-to-UK volumes and UK import dependence are unreconciled, and no filing-sourced exporter volume or UK importer compliance action was found.


Research limitations register (as at November 2026)

  • Gap: Whether default values include the mark-up; full steel default table. Affects: Sections 3.4, 5.2. Source to check: HMRC default values notice and pages.

  • Gap: Steel baseline; binding Q1 2027 rate. Affects: Section 5.1. Source to check: HMRC rates page.

  • Gap: Monitoring period, verification forms, UKAS. Affects: Sections 3.5, 7.3. Source to check: HMRC verification guidance; SI 2026/995.

  • Gap: Penalty and interest rates. Affects: Sections 3.7, 5.4. Source to check: Schedule 17 paras 35 to 37; HMRC penalty guidance.

  • Gap: Valuation for the £50,000 test. Affects: Section 3.2. Source to check: Finance Act 2026 Schedule 17.

  • Gap: Customs warehousing, Windsor Framework. Affects: Section 3.8. Source to check: HMRC customs guidance; s.144.

  • Gap: EU CBAM articles. Affects: Section 4.3. Source to check: EUR-Lex.


SOURCES USED IN THIS REPORT




bottom of page