UK CBAM Returns 2028: The Complete Filing, Calculation and Payment Guide for Importers

Writer: CBAM Research Team
CBAM Research Team
Nov 9
38 min read

CBAM Journal Research & Intelligence Team, Sekason Research Limited. Published November 2026.

Data verified: 9 November 2026 · Next review trigger: 13 November 2026 (HMRC feedback window on monitoring, reporting and verification technical guidance closes)


Disclaimer

This report is for information only. It is not legal, tax, financial or regulatory advice,. Readers should consult a qualified adviser before acting on it. The position described is that at 9 November 2026 and may change as HMRC publishes further guidance.

Read complete disclaimer here; https://www.cbamjournal.com/disclaimer


CBAM Journal graphic with a crane lifting a UK-flag shipping container and text announcing 31 May 2028 CBAM return deadline.

1. Executive Summary

UK CBAM applies to goods imported on or after 1 January 2027, and the first UK CBAM return and payment, covering calendar year 2027, are due on 31 May 2028 (HMRC CBAM policy summary, updated 2 November 2026). HMRC registration under UK CBAM opens on 1 January 2028, and businesses that crossed the £50,000 import threshold during 2027 must register by 31 January 2028, so the 2027 evidence base has to exist before the service does. The only UK CBAM penalty amount HMRC has published is a £500 fixed penalty for failing to keep records; HMRC has not published a rate for late returns, late payment or inaccuracy, as at November 2026.


This guide to UK CBAM return filing 2028 takes an importer from the first import on 1 January 2027 to payment on 31 May 2028. It sets out who is liable, the records that must exist from the first consignment, how emissions are determined from verified data or default values, how Carbon Price Relief reduces the charge, how payment works, and which controls make the return defensible. It rests on Finance Act 2026 Schedule 17 and on SI 2026/802, SI 2026/830 and SI 2026/995, together with SI 2026/809 (rate and relief) and SI 2026/994 (interest).



UK CBAM leaves 12 months between the start of liability and the opening of registration. Every input to the 2027 return, including weight, commodity code, place of origin, supplier emissions evidence and overseas carbon price, must be captured during 2027, while HMRC's default-value and force-of-law notices remain in draft and the first binding quarterly rates are due before the end of 2026. HMRC states that the liable person or their tax agent submits the return, but has not published the submission service or return format. This report separates what is settled, what is draft and what is unpublished. It includes a consignment-level worked example for a steel importer in which every assumption is labelled Illustrative, and it closes with a Research Limitations statement.


Scope: UK CBAM only. EU CBAM appears only where a cross-border issue affects a UK CBAM return.


2. Regulatory Context


2.1 The legal structure: Schedule 17 and five statutory instruments

  • FINDING: UK CBAM takes legal effect on 1 January 2027 under Finance Act 2026 Schedule 17 and five statutory instruments (SI 2026/802, 809, 830, 994 and 995), with SI 2026/802 reg 1(2) confirming commencement, as at November 2026.

  • SO WHAT: UK CBAM relief criteria and interest provisions sit in SI 2026/809 and SI 2026/994, so a team working from only three instruments will miss both.

  • NOW WHAT: Build a UK CBAM instrument register with provision-level references for every duty by 31 December 2026.


Finance Act 2026 received Royal Assent on 18 March 2026, as reported by cbamguide.com. The instruments below carry the operational rules. SI 2026/802 and SI 2026/995 are available in full on legislation.gov.uk and are the instruments quoted in this report.

Instrument

What it does under UK CBAM

Made

Status as at November 2026

Carbon Border Adjustment Mechanism (Administrative Provisions) Regulations 2026, SI 2026/802

Registration information, per-good records, return content, HMRC weight determination

13 July 2026

In force 1 January 2027 (reg 1(2))

Carbon Border Adjustment Mechanism (Transitory Provision) Regulations 2026, SI 2026/830

2027 accounting period and early-2028 deadlines; modifies the late-return penalty table

14 July 2026

In force 1 January 2027

Carbon Border Adjustment Mechanism (Emissions and Verification) Regulations 2026, SI 2026/995

Emissions calculation, verification, verification-report retention

8 September 2026 (laid 9 September)

In force 1 January 2027

SI 2026/809, Calculation of CBAM Rate and Determination of Carbon Price Relief

Rate calculation and relief criteria

13 July 2026

Approved by the Commons on 14 October 2026

SI 2026/994 (C. 81), Finance Act 2009 ss.101-102 (CBAM) (Interest) (Appointed Day) Order 2026

Appoints 1 January 2027 for late-payment and repayment interest provisions

8 September 2026

Made

Source: legislation.gov.uk (SI 2026/802, SI 2026/995); UK Parliament procedure browser (SI 2026/809 approval); cbamguide.com legislation tracker and a LawPlayer mirror of SI 2026/830 for the other entries. The cbamguide.com tracker reports that the objection period for SI 2026/995 ends on 13 November 2026.


The official titles use brackets, as shown above. Importers should read each instrument on legislation.gov.uk before relying on any summary of it, including this one.


2.2 What the regime covers and what commentary still gets wrong

  • FINDING: UK CBAM registration is triggered at £50,000 of CBAM goods imported, tested over a forward 30-day period and over the preceding 12 months on the first day of each month, as at November 2026.

  • SO WHAT: Treating UK CBAM scope as industry-based, or copying EU CBAM's electricity coverage, leads an importer to register the wrong goods and to miss the commodity-code test.

  • NOW WHAT: Build the CBAM commodity-code list and run the first UK CBAM threshold test by 1 January 2027.


UK CBAM covers five goods groups from 1 January 2027: aluminium, cement, fertilisers, hydrogen, and iron and steel (Finance Act 2026 s.143(3), as reported by cbamguide.com and Jones Day). Scope follows commodity code, not industry, according to Paul Hastings (22 September 2026). Electricity is outside UK CBAM scope, as are ceramics and glass. Only direct emissions count in 2027; Jones Day reports that indirect emissions will not be included before 2029.

Two points of date wording differ between law-firm commentary and HMRC, and importers should work from HMRC's wording:

Source

What it says

What HMRC states

Jones Day (22 June 2026)

First payment in late May 2028

Return and payment due 31 May 2028

Baker McKenzie (5 August 2026)

Registration by 1 January 2028

Registration opens on 1 January 2028

Source: HMRC CBAM policy summary (updated 2 November 2026); Jones Day; Baker McKenzie; HMRC "Work out the date you'll need to register" (updated 20 October 2026).


2.3 Status register: what is settled and what is not

  • FINDING: 4 of 10 UK CBAM components carry High or Medium–High risk as at November 2026: the return submission mechanism (High), and return data specifications, monitoring and verification notices, and registration facilities (each Medium–High).

  • SO WHAT: The unsettled UK CBAM items are the operational ones, so a return process built now must absorb HMRC's later specifications without a rebuild.

  • NOW WHAT: Re-run the UK CBAM status register at each HMRC publication, with the first review by 1 January 2027.

UK CBAM component

Status as at November 2026

Risk

What remains open

Finance Act 2026, Schedule 17

Enacted

Low

Importers should read the Schedule's operative text directly

Administrative Provisions Regulations, SI 2026/802

Made; effective 1 January 2027

Low

Reg 10(3) lets HMRC add return content by notice; no notice published

Transitory Provision Regulations, SI 2026/830

Made; sets transitional deadlines

Low

Full text to be read on legislation.gov.uk

Emissions and Verification Regulations, SI 2026/995

Made; effective 1 January 2027

Low

Objection period reported to end 13 November 2026

HMRC return submission mechanism

No portal, API, file format or authentication described

High

HMRC has not published how a return is submitted

Return data specifications and digital reporting

Statutory framework exists

Medium–High

HMRC specifications may follow

Carbon Price Relief evidence and calculation

Guidance updated 2 November 2026

Medium

Return format for the relief item not published

Monitoring and verification notices

Regulations made; default-value and force-of-law notices in draft

Medium–High

Draft notices have no legal force; verifier notice under SI 2026/995 reg 13 not published

HMRC registration and IT facilities

Opens 1 January 2028

Medium–High

Operational readiness not yet shown

Penalties and enforcement

Statutory structure in place

Medium

Only the £500 record-keeping penalty is stated

Source: HMRC CBAM policy summary (updated 2 November 2026); legislation.gov.uk (SI 2026/802, SI 2026/995); HMRC Keeping records (updated 3 November 2026).


3. Compliance Obligations


3.1 Who is liable and when must we register?

  • FINDING: UK CBAM registration is triggered at £50,000 of CBAM goods, with a 31 January 2028 deadline for 2027 triggers, and liability falls on the person in whose name the customs declaration is made, as at November 2026.

  • SO WHAT: UK CBAM liability follows the name on the customs declaration, so declaration practice with freight forwarders and customs agents decides who carries the charge.

  • NOW WHAT: Confirm the declarant of record on every import route by 31 December 2026.


The liable person under UK CBAM is "the person in whose name the customs declaration is made" (HMRC CBAM policy summary, updated 2 November 2026). Registration is triggered on either of two tests. HMRC guidance states: "You must register if you expect to import CBAM goods into the UK worth £50,000 or more within the next 30 days". The second test looks back over the preceding 12 months and is applied on the first day of each month.



Registration itself cannot start early. HMRC guidance states: "Registration for CBAM (Carbon Border Adjustment Mechanism) will open on 1 January 2028." SI 2026/830 sets 31 January 2028 as the deadline for anyone who triggers registration during 2027, according to a mirror of the instrument. The registration information required by SI 2026/802 reg 7(1)(i) includes "the estimated weight of the CBAM goods in each CBAM sector" expected in the 12-month period, and reg 8 requires that "A registered person must keep records evidencing the information required to be provided under regulation 7."


Agents create the main attribution risk. HMRC publishes a separate page, "Check if you're classed as the importer" (published 16 July 2026, updated 7 October 2026). It treats the party named on the import declaration as liable where customs duties are payable, and the party importing the goods where none are payable, even if another person imports on their behalf. Importers that use a forwarder or customs agent should read it against their own declaration arrangements.


3.2 What records must we keep, and for how long?

  • FINDING: SI 2026/802 reg 6 requires UK CBAM records to be kept for 6 years from the day after the accounting period ends (reg 6(2)), and a £500 fixed penalty may apply for failing to keep records, as at November 2026.

  • SO WHAT: A 2027-period UK CBAM record must be kept until 31 December 2033 under reg 6(2), so storage, access and document ownership need a six-year plan from the first import.

  • NOW WHAT: Start the per-good UK CBAM record on 1 January 2027 and set a six-year retention rule in document control by 31 December 2026.


UK CBAM records are kept per good. SI 2026/802 reg 5 provides: "A person who imports a CBAM good in the course of a business must keep a record evidencing the following for that good".

Reg 6(2) provides that a record relating to an accounting period "must be preserved for a period of 6 years" beginning with the day after the accounting period ends, and reg 6(3) applies the same 6 years from the day of creation "in any other case". HMRC's Keeping records page states 6 years from the later of the creation date and the end of the accounting period. Reg 6(4) provides: "All records must be kept and preserved in writing." Weight is recorded in kilogrammes.


A registered person has a further duty under reg 8 to keep records of the registration information.

The UK CBAM record must also support the return's customs link. HMRC guidance requires the 8-digit commodity code in force when the good passed the tax point, and records must show the tax point date and any exemption evidence, such as Returned Goods Relief or Temporary Admission with full relief. HMRC's guidance on keeping records was updated on 3 November 2026 and states that a £500 fixed penalty may apply where records are not kept.


3.3 What must a UK CBAM return contain?

  • FINDING: SI 2026/802 reg 10(1) requires each UK CBAM return to give commodity code, weight, amount of carbon price relief and place of origin for every good, and amendments are allowed within 3 years of period end, as at November 2026.

  • SO WHAT: HMRC can add UK CBAM return content by notice under reg 10(3), so a data model built on four fields may need more fields before the first return.

  • NOW WHAT: Build the UK CBAM data model on the reg 10(1) fields now and review it against any HMRC notice by 1 January 2028.


A UK CBAM return must give the commodity code, weight, amount of carbon price relief and place of origin for each good. Reg 10(1) provides that "the return must include the following information for each CBAM good imported during the accounting period". Reg 10(2) provides that "the return is, to the best of their knowledge, true and accurate." Reg 10(3) provides: "The Commissioners may publish a notice specifying additional information which is to be included in a return." Reg 11 adds: "A person who makes a return for a CBAM good must keep records evidencing the place of origin of that good."


HMRC guidance states that nil returns are required and that amendments must be made within three years of the end of the accounting period. As at November 2026, HMRC has not published a return template, a field list or a submission format, and no HMRC page describes a portal, API, software route or authentication method. Importers should therefore treat any screen layout offered by a third party as unofficial.


3.4 How are emissions determined: verified actual data or default value?

  • FINDING: SI 2026/995 reg 16(3) requires a UK CBAM verification report to be kept for 6 years, and HMRC's draft default-value notice covers 1 January 2027 to 31 December 2028 without legal force, as at November 2026.

  • SO WHAT: Each UK CBAM consignment rests on either a default value or verified data, and supplier data not verified under regs 12 and 13 cannot support a verified-data calculation.

  • NOW WHAT: Issue supplier emissions data requests by 31 December 2026.


SI 2026/995 provides two routes. Reg 4 provides that "the emissions are the weight of the good multiplied by the default value." Reg 5(1) provides that "the emissions must be calculated in accordance with the following steps", and step 8 provides: "Multiply the emissions intensity by the weight of the imported CBAM good."


Verified data carries an evidence burden. Reg 12(1) provides: "All verified emissions data for a CBAM good must be verified by a person". Reg 13(1) provides: "Verified emissions data must be verified by a verifier in accordance with requirements specified in a notice". Under reg 16(1), a registered or registrable person who makes a return "must keep the verification report", and reg 16(3) provides: "The verification report or good-specific verification summary must be kept for a period of 6 years".


Default values are in draft. HMRC published default-value documents for five sectors on 16 October 2026, and its guidance states that each CBAM good has a default value. The notices that give them legal force remain in draft as at November 2026, and HMRC has not published a date on which final notices take effect. Verifier requirements are set by notice under reg 13, so importers should read HMRC's verification guidance, published on 16 October 2026, before asking suppliers for a verification report.


3.5 How does a UK importer claim Carbon Price Relief?

  • FINDING: HMRC lists 16 qualifying carbon pricing schemes for UK CBAM relief, and its Carbon Price Relief guidance was updated on 2 November 2026, as at November 2026.

  • SO WHAT: UK CBAM relief is a self-calculated deduction that cannot exceed liability, so an unsupported claim becomes an inaccuracy exposure where no penalty rate has been published.

  • NOW WHAT: Build the relief evidence file for each overseas installation by 31 March 2027.


HMRC guidance states: "It is the responsibility of the liable person to calculate the CPR (Carbon Price Relief)." It also states: "The total relief claimed cannot exceed the amount of CBAM (Carbon Border Adjustment Mechanism) liability due." The method has four steps. The effective carbon price equals the emissions subject to each scheme element, multiplied by the price per tCO2e, divided by the installation's total emissions. Relief then equals that effective carbon price multiplied by the embodied emissions subject to a qualifying scheme, using the same actual or default values as the return.


Three input rules apply. Prices come from the calendar quarter before import. They are converted at the exchange rate HMRC publishes for the quarter before import, rounded down to two decimals. Free-allocated emissions earn no relief: HMRC states that "Emissions covered by free allowances do not qualify for relief because no effective carbon price has been paid on them". HMRC's list of qualifying schemes was first published on 27 August 2026 with an information cut-off of 19 June 2026. It adds that "If a scheme meets all the criteria but is not listed here, it may still be a qualifying carbon pricing scheme."


Relief is claimed on the return: SI 2026/802 reg 10(1)(c) requires each return to include the amount of carbon price relief, and HMRC's policy summary says relief is claimed on the return. As at November 2026, HMRC has not published the return format for that item.


3.6 How and when is the liability paid?

  • FINDING: HMRC states that UK CBAM returns and payments for the first accounting period are due 5 months after period end, on 31 May 2028, as at November 2026.

  • SO WHAT: The whole 2027 UK CBAM liability falls due in a single payment five months after year end, so the cash must be held and provided for.

  • NOW WHAT: Raise a finance provision from the first 2027 import and hold the cash by 31 May 2028.


HMRC guidance states: "Returns and payments will be due 5 months after the end of the first accounting period (31 May 2028)." HMRC lists these payment methods: Direct Debit, BACS and CHAPS, Faster Payments, payment initiation service providers, cards and cheques. SI 2026/994 appoints 1 January 2027 for the late-payment and repayment interest provisions in Finance Act 2009 ss.101-102, according to cbamguide.com. HMRC's published guidance does not state the interest rate, the payment reference format, the payment account details, or whether instalments or time-to-pay arrangements are available.


3.7 Corrections, overpayments and HMRC determinations

  • FINDING: HMRC allows UK CBAM return amendments within 3 years of the end of the accounting period and repays overpayments only for the 3 years before a claim, as at November 2026.

  • SO WHAT: A late supplier revision can be corrected under UK CBAM only inside that window, and an HMRC officer can substitute their own weight where records are weak.

  • NOW WHAT: Diarise a provisional outer amendment date of 31 December 2030 for the 2027 period by 31 May 2028.


SI 2026/802 reg 12(2) provides: "The officer may determine the weight of a CBAM good for the purposes of CBAM." Reg 12(4) requires that "the officer must notify the person identified in paragraph (1) in writing." The 31 December 2030 date is a plain three-year count from the 31 December 2027 period end; HMRC has not published how it counts the three years or what notification and evidence an amendment needs.


4. Key Dates and Deadlines


4.1 When is the first UK CBAM return due, and what period does it cover?

  • FINDING: The first UK CBAM accounting period runs 1 January to 31 December 2027, and HMRC states the return and payment fall due on 31 May 2028, as at November 2026.

  • SO WHAT: One UK CBAM return carries twelve months of imports, so a data error early in 2027 compounds into a single filing.

  • NOW WHAT: Set internal sign-off for the 2027 UK CBAM return by 30 April 2028.

Date

Regime

Event

Source

13 November 2026

UK CBAM

Objection period for SI 2026/995 reported to end; feedback on HMRC's monitoring, reporting and verification technical guidance reported to close

20 November 2026

UK CBAM and EU CBAM

UK–EU summit, Brussels; ETS link and a possible mutual CBAM exemption reported as draft only

Euronews, 6 November 2026

Before 31 December 2026

UK CBAM

First binding quarterly rates due for publication

HMRC illustrative rates page

1 January 2027

UK CBAM

Regime and SI 2026/802, 830 and 995 in force; record-keeping begins

SI 2026/802

1 January 2028

UK CBAM

HMRC registration opens

HMRC policy summary

31 January 2028

UK CBAM

Registration deadline for 2027 triggers

HMRC policy summary; SI 2026/830 mirror

31 May 2028

UK CBAM

First return and payment, for 1 January to 31 December 2027

HMRC policy summary

Source: HMRC CBAM policy summary (updated 2 November 2026); legislation.gov.uk; cbamguide.com; IACBAM; Euronews.


4.2 What are the 2028 quarterly deadlines?

  • FINDING: The first quarterly UK CBAM return is due 31 July 2028, followed by 29 September 2028, 30 November 2028 and 28 February 2029, as at November 2026.

  • SO WHAT: The 2027 return and the first quarterly UK CBAM return fall 61 days apart, so two return processes run at once in mid-2028.

  • NOW WHAT: Diarise 31 July 2028 as the first quarterly deadline by 31 December 2027.

UK CBAM accounting period

Return and payment due

1 January to 31 December 2027

31 May 2028

1 January to 31 March 2028

31 July 2028

1 April to 30 June 2028

29 September 2028

1 July to 30 September 2028

30 November 2028

1 October to 31 December 2028

28 February 2029

Source: HMRC CBAM policy summary, Table 2 (updated 2 November 2026).

HMRC states that "Returns must be submitted on the last working day of the month". SI 2026/830 covers the deadlines up to the period ending 30 June 2028, according to a mirror of the instrument; the July to December 2028 dates appear in HMRC's policy summary. Importers should check HMRC's latest table before diarising the November 2028 and February 2029 dates.


4.3 The registration gap: liability from 2027, registration from 2028

  • FINDING: UK CBAM liability starts 1 January 2027, registration opens 1 January 2028 and the 2027 trigger deadline is 31 January 2028, leaving 12 months with no HMRC registration channel, as at November 2026.

  • SO WHAT: UK CBAM importers cannot register to file during 2027, so preparation is internal and cannot be tested against any HMRC service.

  • NOW WHAT: Complete a registration readiness pack covering the SI 2026/802 reg 7 information by 30 November 2027.

Milestone

Date

Liability begins on goods imported

1 January 2027

Registration service opens

1 January 2028

Registration deadline for businesses that triggered in 2027

31 January 2028

First return and payment

31 May 2028

Source: HMRC CBAM policy summary (updated 2 November 2026); SI 2026/830 mirror.


As at November 2026, the HMRC registration pages do not set out how liability arising in 2027 interacts with a registration service that opens in 2028; SI 2026/830 supplies the 31 January 2028 deadline that bridges them. The practical effect is a first-use exposure: the first UK CBAM return an importer prepares is also its first use of the HMRC service. A readiness pack should hold the estimated weight of CBAM goods in each sector for the 12-month period (reg 7(1)(i)), the supporting records required by reg 8, and the per-good records from reg 5.


5. Financial Exposure and Risk


5.1 How is the UK CBAM rate set?

  • FINDING: HMRC's illustrative UK CBAM rate for iron and steel is reported at £9.69 per tCO2e, based on an average UK ETS price of £58.15, and it is non-binding, as at November 2026.

  • SO WHAT: UK CBAM has no headline rate, so each quarter's binding rate can change the cost of the same tonne of steel.

  • NOW WHAT: Replace illustrative rates with HMRC's binding Q1 2027 rates when published, which are due by 31 December 2026.


HMRC guidance states: "Unlike most taxes, CBAM does not have a single headline rate set out in primary legislation." UK CBAM rates are set per sector and import quarter, change quarterly with the effective UK carbon price, and are published by the beginning of each quarter from 1 January 2027 (HMRC Rates page, updated 20 October 2026). HMRC states that its illustrative rates create no tax liability for any business.

UK CBAM sector

Illustrative 2027 rate (£ per tCO2e)

Iron and steel

£9.69

Aluminium

£9.79

Cement

£8.78

Fertilisers

£1.45

Hydrogen

£9.24

Source: HMRC "Illustrative CBAM rates and worked example" (16 October 2026), which carries the non-binding status; figures also reported by SteelOrbis (October 2026) and cbamguide.com (23 October 2026). HMRC gives £58.15 as the average UK ETS price for July to September 2026.

This report does not explain how the average UK ETS price translates into each sector's rate. Importers should read HMRC's Rates page and its illustrative rates document before building a budget, and should confirm the figures above against HMRC's document.


5.2 What is the cost difference between default values and verified data?

  • FINDING: HMRC's draft UK CBAM default values for steel are 2.722 tCO2e per tonne for hot-rolled flat coils (CN 7208 10 00) and 2.856 for semi-finished products (CN 7207 11 14), as at November 2026.

  • SO WHAT: Without verified data, UK CBAM charges the importer on the default intensity, so any saving depends on how the supplier's verified intensity compares with it.

  • NOW WHAT: Rank suppliers by tonnage and request verified data from the largest by 31 March 2027.

UK CBAM good

CN code

Draft default (tCO2e per tonne)

Hot-rolled flat coils

7208 10 00

2.722

Semi-finished non-alloy steel

7207 11 14

2.856

Unwrought aluminium slabs

7601 10 10

2.058

Aluminium alloy billets

7601 20 40

2.030

Source: cbamguide.com, "UK CBAM illustrative rates and default values" (23 October 2026). These are default values from a draft notice for 1 January 2027 to 31 December 2028. The notice has no legal force as at November 2026. They are not verified actuals and not benchmarks.

HMRC's guidance states that "Each Carbon Border Adjustment Mechanism (CBAM) good has a default value", and the five sector documents were published on 16 October 2026. The table shows only four goods; every other good has its value in HMRC's sector documents. Importers should confirm each value on HMRC's default-values page before using it.


5.3 How much can Carbon Price Relief reduce the charge?

  • FINDING: Turkish steel exports to the UK rose 90% to 700,000 t in January to July 2026, yet Türkiye is absent from HMRC's list of 16 UK CBAM qualifying schemes, as at November 2026.

  • SO WHAT: For origins without a listed scheme, UK CBAM relief is nil unless the scheme meets HMRC's criteria, and the free-allocated share of EU-origin steel earns no relief.

  • NOW WHAT: Re-check HMRC's list of qualifying schemes each quarter, starting by 31 December 2026.


S&P Global (9 October 2026) reports the Turkish volumes. Türkiye's emissions trading system took legal effect on 27 August 2026, after the HMRC list's information cut-off of 19 June 2026. Absence from the list does not close the question: HMRC states that an unlisted scheme "may still be a qualifying carbon pricing scheme" if it meets all the criteria, which sit in SI 2026/809.


HMRC's list names Australia (Safeguard Mechanism), Canada (Federal OBPS), Chile (carbon tax), China (National ETS), the EU ETS, India (CCTS), Japan (GX-ETS), Kazakhstan, Korea, Montenegro, New Zealand, Serbia (carbon tax), Singapore (carbon tax), South Africa (carbon tax), Switzerland (CHETS) and Taiwan (carbon fee). For EU-origin goods, the free-allocated share of an installation's emissions decides how much of the EU ETS price counts, because the relief cap and the free-allocation exclusion in section 3.5 both apply.


5.4 What penalties and interest apply?

  • FINDING: The only UK CBAM penalty amount HMRC has published is a £500 fixed penalty for failing to keep records, and no rate is published for late returns, late payment or inaccuracy, as at November 2026.

  • SO WHAT: The cost of a late or inaccurate UK CBAM return cannot be quantified from published sources, so exposure must be managed through timing and evidence.

  • NOW WHAT: Treat 31 May 2028 as a hard payment deadline and fund the full liability by 31 May 2028.


HMRC guidance states:

"HMRC (HM Revenue and Customs) will extend the use of existing powers and penalties to enforce compliance with CBAM"

UK CBAM penalty or charge

Published position as at November 2026

Failure to keep records

£500 fixed penalty "may apply"

Late return

Category listed; rate not published

Late payment

Category listed; rate not published

Inaccuracy or error

Category listed; rate not published

Failure to notify

Category listed; rate not published

Tax-avoidance disclosure, information notices

Categories listed; amounts not published

Fraudulent evasion, deliberate misstatement

Criminal offences listed; no amount

Interest on late payment and repayment

Appointed day 1 January 2027 (SI 2026/994); rate not published

Source: HMRC CBAM policy summary (updated 2 November 2026); HMRC Keeping records (updated 3 November 2026); cbamguide.com for SI 2026/994.

SI 2026/830 reg 3 modifies item 6 of the table in paragraph 2(1) of Schedule 24 to the Finance Act 2021, according to cbamguide.com. Importers should read the modified table on legislation.gov.uk to see the late-return penalty position.


5.5 Market-level estimates (context only)

  • FINDING: A GTRI estimate reported on 26 July 2025 puts Indian exports facing UK CBAM at USD 775 mn with a tax of 14% to 24%, while HM Treasury's draft impact note carries no sector figures, as at November 2026.

  • SO WHAT: The advocacy ranges conflict and pre-date the final UK CBAM legislation, so neither can anchor a budget.

  • NOW WHAT: Budget from your own consignment data from 1 January 2027.


SMM (30 May 2025) reports the same USD 775 mn with a tax of up to 35% and no GTRI credit, so the two ranges conflict. Both pre-date the final legislation. HM Treasury's draft tax information and impact note, issued with the consultation of 10 February to 24 March 2026, lists the affected sectors but carries no figures. These estimates are context only.


6. Sector-Specific Impact Analysis

UK CBAM sector

In scope from 1 January 2027

Illustrative rate (£ per tCO2e)

Draft default values (tCO2e per tonne)

Iron and steel

Yes

£9.69

2.722 (CN 7208 10 00); 2.856 (CN 7207 11 14)

Aluminium

Yes

£9.79

2.058 (CN 7601 10 10); 2.030 (CN 7601 20 40)

Cement

Yes

£8.78

In HMRC's cement document

Fertilisers

Yes

£1.45

In HMRC's fertiliser document

Hydrogen

Yes

£9.24

In HMRC's hydrogen document

Electricity

No

Not applicable

Not applicable

Source: Jones Day (22 June 2026); SteelOrbis; cbamguide.com (23 October 2026); HMRC "Check the default values for CBAM" (16 October 2026). Rates are non-binding; default values are draft.


6.1 Iron and steel

  • FINDING: UK CBAM's illustrative iron and steel rate is £9.69 per tCO2e and the draft default for hot-rolled flat coils is 2.722 tCO2e per tonne, as at November 2026.

  • SO WHAT: UK CBAM steel cost depends on both the quarterly rate and the intensity applied, so each moves the importer's bill whether or not supplier data is verified.

  • NOW WHAT: Classify every steel line to its 8-digit commodity code by 31 December 2026.


Commodity code decides the default value. The semi-finished default of 2.856 is about 4.9% higher than the flat-coil default of 2.722, so a misclassified line changes the emissions charged. Turkish steel exports to the UK rose 90% to 700,000 t in January to July 2026 (S&P Global, 9 October 2026; underlying dataset not named), which makes origin-by-origin evidence the priority for steel importers. UK Steel, with the Mineral Products Association and the Chemical Industries Association, warned in January 2026 that the planned design risked accelerating deindustrialisation (SteelOrbis, 22 January 2026; trade-press report, no figures given).


6.2 Aluminium

  • FINDING: UK CBAM's illustrative aluminium rate is £9.79 per tCO2e, and the draft defaults are 2.058 tCO2e per tonne for CN 7601 10 10 and 2.030 for CN 7601 20 40, as at November 2026.

  • SO WHAT: Two default values cover only two aluminium goods, so other aluminium lines need the value in HMRC's aluminium document before UK CBAM cost can be modelled.

  • NOW WHAT: Check each aluminium commodity code against HMRC's draft default list by 31 December 2026.


HMRC publishes aluminium default values in a separate sector document dated 16 October 2026. The two values above come from a draft notice reported by cbamguide.com on 23 October 2026, and the notice has no legal force as at November 2026. No aluminium trade-body figure is cited in this report.


6.3 Cement, fertilisers and hydrogen

  • FINDING: UK CBAM's illustrative rates are £8.78 for cement, £1.45 for fertilisers and £9.24 for hydrogen per tCO2e, as at November 2026.

  • SO WHAT: The fertiliser rate sits far below the other four UK CBAM sectors, while cement and hydrogen importers face rates close to steel's.

  • NOW WHAT: Obtain HMRC's cement, fertiliser and hydrogen default-value documents by 31 December 2026.


A Treasury minister told the Finance Bill committee in February 2026 that the initial UK CBAM impact on fertilisers was expected to be very modest (reported on a Hansard mirror). Breedon said on 7 April 2026 that key elements of UK CBAM remained unclear months before implementation (S&P Global, 8 April 2026). Default values for all three sectors sit in HMRC's separate sector documents, published on 16 October 2026, which importers must read directly.


6.4 What is out of scope: electricity, ceramics, glass and indirect emissions

  • FINDING: UK CBAM excludes electricity, ceramics and glass, and Jones Day reports that indirect emissions are not included before 2029, as at November 2026.

  • SO WHAT: Only direct emissions enter 2027 UK CBAM calculations, so supplier requests must treat direct emissions as the primary figure.

  • NOW WHAT: Leave indirect-emission fields out of the 2027 supplier template and revisit the point by 31 December 2028.


A Treasury minister said in February 2026 that sectoral scope would be kept under review, with no timetable set for glass or ceramics (reported on a Hansard mirror).


7. Practical Action Framework

UK CBAM importers have no HMRC return template to copy, so the templates in this section are CBAM Journal research tools, not HMRC forms. HMRC has not published a return template, field list or submission format, as at November 2026, and nothing here simulates an HMRC screen.


7.1 The eight-link compliance chain and the 2027 preparation calendar

  • FINDING: The UK CBAM compliance chain runs 17 months from the start of record-keeping on 1 January 2027 to payment on 31 May 2028, across eight links, as at November 2026.

  • SO WHAT: The chain fails at its weakest link, and the first two links, import identification and customs reconciliation, set the data quality of everything after them.

  • NOW WHAT: Assign an owner to each of the eight links by 31 December 2026.

Link

UK CBAM task

Suggested owner

First date

1

Identify each in-scope good by 8-digit commodity code

Customs

31 December 2026

2

Reconcile declarant, tax point, origin, consignment and net weight

Customs

1 January 2027

3

Collect supplier emissions evidence

Procurement and sustainability

31 January 2027

4

Decide verified data or default value per consignment

Compliance

1 January 2027

5

Calculate emissions and liability at the quarterly rate

Finance

First quarter of 2027

6

Establish and calculate Carbon Price Relief

Finance and compliance

31 March 2027

7

Reconcile the calculation to the ledger provision

Finance

Each quarter

8

Prepare, approve and pay the return

Compliance and finance

30 April 2028 sign-off; 31 May 2028 payment


7.2 Import-to-return reconciliation schedule

  • FINDING: SI 2026/802 reg 6 requires per-good UK CBAM records for 6 years, and reg 10(1) requires four return items per good, so the schedule must hold all four, as at November 2026.

  • SO WHAT: UK CBAM records are kept in kilogrammes while emissions run per tonne, so a schedule that does not convert units invites an error in every consignment.

  • NOW WHAT: Test the schedule on January 2027 imports by 28 February 2027.

Column

Purpose

Basis

Declaration reference and declarant

Shows the liable person

HMRC policy summary

Tax point date

Fixes the commodity code in force and the import quarter

HMRC guidance

8-digit commodity code

Return item

SI 2026/802 reg 10(1)

Description, date imported and value of the good

Record items

SI 2026/802 reg 5(a) to (c)

Place of origin and origin evidence

Return item and record

Regs 10(1), 11

Net weight in kilogrammes, and in tonnes

Return item and calculation

Regs 5, 6; SI 2026/995 reg 5

Supplier and installation

Links the good to emissions evidence

Supports the verification report kept under SI 2026/995 reg 16

Emissions basis, value and source

Verified data or default value

SI 2026/995 regs 4, 5

Amount of carbon price relief and scheme

Return item and relief

Reg 10(1)(c); HMRC relief guidance

Exemption evidence

Returned Goods Relief, Temporary Admission

HMRC guidance

HMRC's guidance reviewed does not say whether the customs declaration carries a new CBAM data element. HMRC publishes CDS declaration completion instructions (Tariff Volume 3), and a freight forwarder's guidance (Denholm Good Logistics, updated 19 August 2026) suggests treating CDS data as the master record. The same forwarder states that goods under inward processing or customs warehousing are not in scope until released to free circulation.


7.3 Supplier emissions evidence: request and validation

  • FINDING: SI 2026/995 reg 16(3) requires the UK CBAM verification report to be kept for 6 years, so every supplier request must ask for the report itself, as at November 2026.

  • SO WHAT: A supplier statement without a verification report cannot be retained as verified evidence, and the importer loses the verified-data route for that consignment.

  • NOW WHAT: Send the supplier information request in Q4 2026 and set a return date of 31 January 2027.

Request item

What to obtain

Basis

Installation identity and location

Name, address, production route

Links good to evidence

Goods and commodity codes

CN codes produced at the installation

SI 2026/802 reg 10(1)

Verified emissions intensity

tCO2e per tonne, per good

SI 2026/995 reg 5

Verification report

Report or good-specific verification summary

SI 2026/995 reg 16

Verifier and notice basis

Verifier identity and the HMRC notice applied

SI 2026/995 regs 12, 13

Overseas carbon price paid

Scheme, price, quarter

HMRC relief guidance

Free-allocated emissions

Emissions covered by free allowances

HMRC qualifying schemes list

Origin evidence

Place of origin documents

SI 2026/802 reg 11

Validation test: reject any intensity figure that arrives without its report, and log the rejection with its date.


7.4 Decision tree: actual verified data or default value

  • FINDING: SI 2026/995 provides a default route in reg 4 and a stepwise actual route in reg 5, and HMRC's draft default values run from 1 January 2027 to 31 December 2028, as at November 2026.

  • SO WHAT: The UK CBAM basis is set consignment by consignment, so each consignment needs a recorded basis that an HMRC officer can follow.

  • NOW WHAT: Record the emissions basis for each consignment at the tax point from 1 January 2027.


1. Does a verification report exist for this installation and good that meets SI 2026/995 regs 12 and 13?

2. If yes, calculate by the reg 5 steps ending "Multiply the emissions intensity by the weight of the imported CBAM good." Keep the report for 6 years (reg 16(3)).

3. If no, apply reg 4: weight multiplied by the default value for the commodity code, taken from HMRC's default-value document.

4. Record the basis, the value and the source document on the reconciliation schedule.

The tree reflects SI 2026/995 regs 4, 5 and 12 to 16 as quoted. The full steps of reg 5 and HMRC's notices set further conditions, so importers should read both before relying on the tree.


7.5 Worked example: a steel importer's first return

  • FINDING: On HMRC's illustrative steel rate of £9.69 and draft defaults of 2.722 and 2.856 tCO2e per tonne, an Illustrative two-consignment UK CBAM return totals £28,950.31 with verified data and £31,096.13 without, as at November 2026.

  • SO WHAT: Verified data saves £2,145.82 in this Illustrative case, and the saving moves with the supplier's verified intensity, the quarterly rate and the free-allocated share.

  • NOW WHAT: Replicate the schedule on January 2027 imports and replace every Illustrative input with a documented figure by 31 January 2027.


This is an Illustrative example of mechanics. It is not a forecast. Binding quarterly rates and final default values will differ.


The calculation in words. Embedded emissions equal net weight in tonnes multiplied by emissions intensity (SI 2026/995 regs 4 and 5). HMRC expresses the rate per tCO2e, so liability before relief equals embedded emissions multiplied by the rate for the sector and import quarter. The effective carbon price equals emissions subject to the scheme's price multiplied by price per tCO2e, divided by total installation emissions. Relief equals the effective carbon price multiplied by embodied emissions, capped at liability before relief. Net liability equals liability before relief less relief.


Table 1: Sourced figures

Input

Value

Source

Emissions formula

Weight × intensity; default route: weight × default value

SI 2026/995 regs 4, 5

Default value, CN 7208 10 00

2.722 tCO2e per tonne (draft notice, no legal force)

cbamguide.com, 23 October 2026

Default value, CN 7207 11 14

2.856 tCO2e per tonne (draft notice, no legal force)

cbamguide.com, 23 October 2026

Iron and steel illustrative rate

£9.69 per tCO2e, non-binding

SteelOrbis; cbamguide.com

Relief method and cap

Four-step effective price; relief cannot exceed liability

HMRC, updated 2 November 2026

Free-allocated emissions

Earn no relief

HMRC qualifying schemes list

Price and exchange rule

Quarter before import; HMRC rate rounded down to two decimals

HMRC relief guidance

EU ETS

On HMRC's list of 16 qualifying schemes

HMRC list, 27 August 2026


Table 2: Illustrative assumptions

Assumption

Value

Consignment A

CN 7208 10 00, EU origin, imported Q1 2027, 1,000 t (1,000,000 kg). Illustrative

Consignment B

CN 7207 11 14, Türkiye origin, imported Q3 2027, 800 t (800,000 kg). Illustrative

A1 verified intensity

1.900 tCO2e per tonne. Illustrative

Q1 2027 rate

£9.69 per tCO2e. Illustrative (HMRC illustrative figure)

Q3 2027 rate

£10.50 per tCO2e. Illustrative

EU ETS price paid by A's installation

€82.32 per tCO2e. Illustrative stand-in

Exchange rate

£0.86 per €1. Illustrative

Installation emissions

10,000 tCO2e, of which 1,000 carry a purchased-allowance price and 9,000 are covered by free allowances. Illustrative

Relief on B

None, as no listed scheme was identified for Türkiye origin at the list's 19 June 2026 cut-off. Illustrative

Rounding

Full precision carried; line totals rounded to the penny. Illustrative

For Q1 2027 imports the quarter before import is Q4 2026, and the Commission publishes its Q4 2026 EU CBAM certificate price on 4 January 2027. The example therefore borrows the Q3 2026 price of €82.32, published on 5 October 2026, as an Illustrative stand-in. The figure HMRC accepts is the price the installation paid, evidenced for that installation.


Table 3: Emissions and liability before relief

Line

Basis

Weight (t)

Intensity (tCO2e per tonne)

Emissions (tCO2e)

Rate (£ per tCO2e)

Liability before relief

A1

Verified

1,000

1.900

1,900.000

9.69

£18,411.00

A2

Default

1,000

2.722

2,722.000

9.69

£26,376.18

B

Default

800

2.856

2,284.800

10.50

£23,990.40


Relief on A.

Price in sterling: €82.32 × 0.86 = £70.7952 per tCO2e. Effective carbon price: (1,000 × £70.7952) ÷ 10,000 = £7.07952 per tCO2e. Relief on A1: £7.07952 × 1,900 = £13,451.09,

below the £18,411.00 cap. Relief on A2: £7.07952 × 2,722 = £19,270.45, below the £26,376.18 cap. B receives no relief.


Table 4: Net liability by scenario

Scenario

A net

B net

Return total

Embedded emissions (tCO2e)

1: A verified, B default

£4,959.91

£23,990.40

£28,950.31

4,184.800

2: A default, B default

£7,105.73

£23,990.40

£31,096.13

5,006.800

Difference



£2,145.82


Cap test. If 4,000 rather than 1,000 of the installation's 10,000 tCO2e carried a price, the effective carbon price would be £28.31808 and relief on A1 would be £53,804.35. The cap would limit it to £18,411.00, and net liability on A would be nil.



Ledger reconciliation (Scenario 1). Provision for Q1 2027 imports is £4,959.91; provision for Q3 2027 imports is £23,990.40; the provision total of £28,950.31 equals the return total, so the difference to be investigated is nil. Payment falls due on 31 May 2028.


7.6 Carbon Price Relief evidence file

  • FINDING: HMRC's UK CBAM relief method takes prices from the calendar quarter before import and an exchange rate rounded down to two decimals, with guidance updated 2 November 2026, as at November 2026.

  • SO WHAT: UK CBAM relief is lost where evidence cannot show the effective carbon price for each installation and quarter.

  • NOW WHAT: Open the evidence file on the first import from each installation and complete it by 31 March 2028.

Evidence item

Content

Scheme

The scheme on HMRC's list of 16, or the criteria met if unlisted

Installation

Name and location

Emissions subject to the price

tCO2e, by scheme element

Price paid

Per tCO2e, with the quarter before import

Free-allocated emissions

tCO2e covered by free allowances

Exchange rate

HMRC-published rate, rounded down to two decimals

Source documents

Evidence for each figure above

7.7 Controls: responsibility matrix and first-return readiness checklist

  • FINDING: UK CBAM carries a £500 record-keeping penalty, 6-year retention and a 3-year amendment window, and SI 2026/802 reg 10(2) requires a true and accurate return, as at November 2026.

  • SO WHAT: Customs, procurement, finance, sustainability and compliance each hold part of the UK CBAM data, so without named ownership no one can sign the accuracy declaration with confidence.

  • NOW WHAT: Hold the first cross-functional readiness review by 30 November 2027 and final sign-off by 30 April 2028.

Function

UK CBAM responsibility

Customs

Commodity codes, declarant, tax point, origin, net weight

Procurement

Supplier requests, verification reports, contract terms

Sustainability

Validation of emissions evidence

Finance

Rate application, provision, payment, ledger reconciliation

Compliance

Basis decision, relief claim, return approval, amendments

First-return readiness checklist:

1. Every 2027 import appears on the reconciliation schedule with all four reg 10(1) items.

2. Every consignment has a recorded emissions basis and, where verified, a retained report.

3. Every relief claim has an evidence file and is within the liability cap.

4. The provision equals the return total.

5. Registration is complete by 31 January 2028.

6. Payment is funded for 31 May 2028.


8. Strategic Outlook


8.1 UK–EU ETS link and a possible mutual exemption

  • FINDING: A UK–EU summit is set for 20 November 2026, yet no UK CBAM exemption for EU goods is in force, as at November 2026.

  • SO WHAT: A planned-for exemption that does not arrive leaves an importer with an unprovided UK CBAM liability on EU-origin goods.

  • NOW WHAT: Provide for EU-origin imports in full from 1 January 2027.


Euronews reported on 6 November 2026 a draft that would exempt each side's goods from the other's carbon border charge once the carbon markets are linked. The report describes a draft only. There is no legal text and no effective date, and nothing in the draft is law. The UK is not listed in Annex III to EU CBAM, so UK-origin goods owe EU CBAM until that changes.

Cross-border point

Position as at November 2026

EU-origin goods under UK CBAM

Within UK CBAM from 1 January 2027 until exemption legislation exists on both sides (cbamguide.com)

EU ETS price and UK CBAM relief

Emissions covered by free allowances earn no UK CBAM relief (HMRC list of qualifying schemes)

EU-verified emissions data

HMRC guidance does not state that UK CBAM accepts it; check HMRC's verification guidance

8.2 What HMRC has yet to publish: the watchlist

  • FINDING: Feedback on HMRC's monitoring, reporting and verification technical guidance is reported to close on 13 November 2026, and binding UK CBAM quarterly rates are due before 31 December 2026, as at November 2026.

  • SO WHAT: Six unpublished UK CBAM items decide the final shape of the return, and each can change an input to the cost model.

  • NOW WHAT: Review the watchlist on 1 January 2027 and every quarter after.

UK CBAM item

Status as at November 2026

Trigger date

Binding quarterly rates

Not published; illustrative rates only

Due before 31 December 2026

Final default-value and force-of-law notices

Draft; no legal force

No date published

Monitoring, reporting and verification technical guidance

Feedback reported open

13 November 2026

Verifier notice under SI 2026/995 reg 13

Verifier requirements set by notice

No date published

Return submission mechanism and registration service

Not described by HMRC

Registration opens 1 January 2028

Regulations excluding linked ETS goods (Finance Act 2026 ss.156-157)

Reported as not yet made as at 13 October 2026; would need Commons approval

No date published

Source: HMRC CBAM policy summary; HMRC collection page; cbamguide.com; IACBAM.


8.3 Planning horizon 2027 to 2029

  • FINDING: UK CBAM moves from one annual return in May 2028 to quarterly returns from 31 July 2028, and Jones Day reports indirect emissions are not included before 2029, as at November 2026.

  • SO WHAT: The cycle moves from one filing to the 2027 return plus three quarterly filings in 2028, with a fourth due 28 February 2029, which needs a standing monthly close.

  • NOW WHAT: Build the monthly UK CBAM close process by 31 December 2027.


Importers should model a scope change as possible and unscheduled, given the ministerial statement in section 6.4 that scope will be kept under review, and should keep commodity-code mapping current.

For a Compliance Manager, the sequence is fixed: by 31 December 2026, confirm the declarant of record on every import route, assign an owner to each of the eight compliance links and send supplier emissions requests; on 1 January 2027, start the per-good record; and fund the full liability for payment on 31 May 2028.


9. FAQ


How do I convert thousands of customs declaration lines into the consignment records required for the UK CBAM return?

Map each declaration line to the 8-digit commodity code in force when the good passed the tax point, then record the reg 10(1) items for every good: commodity code, weight, amount of carbon price relief and place of origin. SI 2026/802 reg 5 requires a record per good (commodity code and description, import date, value and weight), reg 4 sets weight in kilogrammes and reg 6(4) requires records in writing. HMRC has not published whether the customs declaration carries a new CBAM data element, so build the schedule from existing declaration fields and test it on January 2027 imports by 28 February 2027.


Who is legally responsible for UK CBAM when my freight forwarder or customs agent submits the customs declaration?

HMRC guidance defines the liable person as the person in whose name the customs declaration is made. Where customs duties are payable the party named on the import declaration is liable, so declaration practice decides who carries the UK CBAM charge; where none are payable, the party importing the goods is liable. Read HMRC's "Check if you're classed as the importer" page against your declaration arrangements by 31 December 2026.


Should I use actual verified emissions or HMRC default values for a consignment?

SI 2026/995 provides both routes: reg 4 multiplies weight by the default value, and reg 5 calculates from emissions intensity. Verified data must be verified by a verifier under regs 12 and 13, and the verification report is kept for 6 years. HMRC's default values are in draft for 1 January 2027 to 31 December 2028 and have no legal force yet, so record the basis for each consignment at the tax point from 1 January 2027.


How do I calculate Carbon Price Relief when my supplier pays carbon costs under more than one qualifying scheme?

HMRC's method calculates an effective carbon price from the emissions subject to each scheme element, so evidence is needed for each scheme and installation. Relief cannot exceed the UK CBAM liability, and free-allocated emissions earn none. Relief is claimed on the return (SI 2026/802 reg 10(1)(c)) and HMRC has not published the return format, so build the evidence file for each installation by 31 March 2027.


What happens if we cross the £50,000 threshold during 2027 but HMRC registration is not open yet?

Liability under UK CBAM applies to goods imported from 1 January 2027, whether or not registration has opened. HMRC registration opens on 1 January 2028, and SI 2026/830 sets 31 January 2028 as the deadline for anyone who triggered registration in 2027, according to a mirror of the instrument. Keep per-good records from the first import and register between 1 and 31 January 2028.


What should we do if a supplier revises its emissions data after the return has been submitted?

Amend the return: HMRC allows amendments within 3 years of the end of the accounting period. On a plain three-year count, 2027 amendments run to 31 December 2030, but HMRC has not published its counting rule or the evidence an amendment needs. Keep the revised verification report for 6 years and set an internal cut-off well before 31 December 2030.


10. Research Limitations, Disclaimer and Sources


Research Limitations

Several UK CBAM operational points could not be established from published sources as at 9 November 2026, and readers should check each against the live HMRC page before relying on it.

Legislation read in full and not read in full. SI 2026/802 and SI 2026/995 were read on legislation.gov.uk. The text of Finance Act 2026 Schedule 17 was not available for this report, so the registration trigger, accounting periods, payment duty, penalty provisions and Carbon Price Relief provisions are described from other legislation's cross-references, HMRC guidance and third-party summaries, and no verbatim Schedule 17 sentence is quoted. SI 2026/830 was read through a mirror site and paraphrased. SI 2026/809 and SI 2026/994 are described from HMRC guidance and cbamguide.com. The intermediate calculation provisions of SI 2026/995 (regs 6 to 9) are not quoted. Readers should read each instrument on legislation.gov.uk before relying on this report.

Operational points HMRC has not published, as far as could be found. HMRC pages do not describe how a UK CBAM return is submitted: no submission service, API, software route, file format, agent access or testing environment is published. HMRC states that registration will use a Government Gateway account. The return format for the Carbon Price Relief item is not published. HMRC's registration guidance does not yet set out the process. Whether the customs declaration or return carries a new CBAM identifier on CDS is not described, and nor is the treatment of inward processing, customs warehousing, free zones and goods in transit. The payment reference format, payment account details and any instalment or time-to-pay arrangement are not published. The notice setting verifier requirements under SI 2026/995 reg 13, the names of eligible accreditation bodies and any list of accredited verifiers were not found. The HMRC cement, fertiliser and hydrogen default-value documents were not opened, and no date has been published for final default-value notices. Binding quarterly rates are not yet published; the first are due before the end of 2026.


Penalty, interest and exposure figures. HMRC has not published, in the material reviewed, a penalty rate for late returns, late payment or inaccuracy; only the £500 record-keeping penalty is stated. The replacement wording for item 6 of the table in paragraph 2(1) of Schedule 24 to the Finance Act 2021 (SI 2026/830 reg 3) was not seen. No interest rate was found. No official sector-level exposure, Exchequer, business-count or compliance-cost figure was found, and the final HM Treasury tax information and impact note was not located.


Default values, rates and prices. UK default values for only four goods (two steel, two aluminium) are reported, confirmed on HMRC's iron and steel and aluminium default-value pages; none were obtained for cement, fertilisers, hydrogen or the remaining steel and aluminium goods. The period of the draft default-value notice (1 January 2027 to 31 December 2028) is reported by cbamguide.com, and HMRC's sector pages do not state it. The illustrative UK rates and the £58.15 average UK ETS price for July to September 2026 come from HMRC's illustrative rates document and are non-binding. The worked example in Section 7.5 uses Illustrative inputs, which are labelled.


Trade, company and statement evidence. The Turkish steel volumes are reported by S&P Global without a named dataset. No UK import volumes by sector were found. Statements from ministers, law firms and industry bodies are paraphrased and attributed, and none was checked against its primary text. No quote from an HMRC or DESNZ official was found.


Cross-border points. No primary UK Government or Commission page on ETS linking was read. The outcome of the 20 November 2026 summit falls after the report date, and any statement of exemption before then is premature. No source confirms that UK CBAM accepts EU-verified emissions data, or sets out the treatment of goods in transit.


Conflicts between sources. Registration is described by HMRC as opening on 1 January 2028, by Baker McKenzie as by 1 January 2028, and the first payment as late May 2028 by Jones Day against HMRC's 31 May 2028. Objection-period dates for SI 2026/802 and SI 2026/995 rest on cbamguide.com alone.


SOURCES USED IN THIS REPORT


UK legislation and Parliament


HMRC, GOV.UK and HM Treasury


EU institutions (cross-border points only)


Law firms, specialist sites and trade press


© 2026 Sekason Research Limited, London. All rights reserved. This report is published by CBAM Journal for information only and is not legal, tax or financial advice. No part may be copied, redistributed or reproduced without prior written permission from Sekason Research Limited, except for brief quotation with clear attribution to CBAM Journal and a link to the original article.